{"id":54232,"date":"2026-06-18T08:04:44","date_gmt":"2026-06-18T08:04:44","guid":{"rendered":"https:\/\/sitemate.com\/excavation-permit\/"},"modified":"2026-06-18T08:04:54","modified_gmt":"2026-06-18T08:04:54","slug":"excavation-permit","status":"publish","type":"post","link":"https:\/\/sitemate.com\/au\/templates\/safety\/forms\/excavation-permit-template\/","title":{"rendered":"Excavation Permit"},"content":{"rendered":"","protected":false},"excerpt":{"rendered":"","protected":false},"author":10,"featured_media":54226,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","rank_math_title":"Excavation Permit Template & Requirements Guide | Sitemate","rank_math_description":"Get your excavation permit template with OSHA compliance requirements. Digital forms for safer construction sites. Start your free template today.","rank_math_canonical_url":"","rank_math_focus_keyword":"Excavation Permit"},"categories":[147],"tags":[],"industry":[124,123,125],"product":[78],"region":[145],"system":[87],"content_type":[99],"class_list":["post-54232","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-migration","industry-building-construction","industry-civil-construction","industry-tunnel-construction","product-dashpivot","region-global","system-safety","content_type-template-landing-page"],"acf":{"template_lp_template_name":"Excavation Permit","template_lp_gallery_repeater":null,"template_lp_template_introduction":"<p>This Excavation Permit is an easy-to-use form that your workers can use to request, review, and approve excavation work before digging begins. Record important excavation details such as the work location, excavation depth, ground conditions, underground services, access requirements, shoring or benching controls, exclusion zones, plant and equipment, approvals, and sign-offs in this free form.<br>\nPlanning trenching, digging, or other excavation activities on your site? Looking for an excavation permit example to help guide your own permit process? This Excavation Permit helps teams document important work procedures such as service checks, ground support requirements, access controls, and emergency arrangements before excavation starts. Then, you can even share the completed permit with supervisors, contractors, and other stakeholders by exporting it to PDF or CSV.<\/p>","template_lp_template_name_abbreviation":"","template_lp_function":"Safety","template_lp_function_url":"","template_lp_template_image_cover":"https:\/\/sitemate.com\/wp-content\/uploads\/2026\/06\/Excavation-Permit1-1-scaled.jpg","template_image_gallery_repeater_url":[54228,54229,54230,54226],"template_lp_what_is_description":"<p>An Excavation Permit is a document used by site teams, supervisors, and contractors to approve excavation work before soil, ground, or existing surfaces are disturbed. This permit usually includes details on the excavation location, work scope, underground services, ground conditions, excavation depth, protective systems, access points, exclusion zones, and people responsible for the work.<br>\nDue to the risks that come with excavation work, hazards such as ground collapse, buried utilities, falling materials, water ingress or infiltration, and unsafe access have to be planned around to lessen potential accidents. This makes Excavation Permits highly relevant in industries like construction, utilities, civil works, infrastructure, mining, and industrial maintenance, where digging and ground disturbance are common.<\/p>","template_lp_template_variation_name":"Excavation Work Permit","template_lp_document_comparison_header":"Compare\/preview this Excavation Work Permit to traditional Word\/Excel documents","template_lp_document_comparison_content":"<p>Curious to see how this Excavation Permit stacks up against other legacy formats? Check out the preview below for free, and see just how easy it is to use.<\/p>","template_url_dashpivot_url":"https:\/\/dashpivot.com\/embed\/library-apps\/5b400af874f969121af9e857","template_lp_applicable_standards_content":"<p>There are generally no explicit formatting requirements for an Excavation Permit. However, most construction, utility, and workplace safety laws require employers to assess hazards and document controls before digging or trenching work begins, and an Excavation Permit is a good document to support compliance with this. Here are examples of regulations on excavation commonly referenced around the world:<\/p>\n<ul>\n<li>OSHA's CFR 1926 (Subpart P) covers regulations on excavation work in the USA<\/li>\n<li>The UK Construction Regulations of 2015 and the UK HSG47 regulations both cover safety requirements regarding excavation in the UK region<\/li>\n<li>Safe Work Australia Excavation Work Code of Practice 2021 covers excavation safety requirements in Australia<\/li>\n<li>Local WHS laws commonly require excavation permits, service checks, and ground control measures in the NZ area<\/li>\n<\/ul>","template_lp_staff_members_and_parties_content":"<p>An Excavation Permit is primarily used by project teams that manage digging, trenching, ground disturbance, or buried service work. Here are examples of other common parties that use an Excavation Permit:<\/p>\n<ul>\n<li>Site supervisors and project managers<\/li>\n<li>Excavation workers<\/li>\n<li>Utility locators and service detection teams<\/li>\n<li>Contractors and subcontractors carrying out excavation work<\/li>\n<\/ul>","template_lp_business_risks_content":"<p>Using an Excavation Permit helps reduce the risk of hazards such as trench collapse, buried service strikes, plant interaction, falls into excavations, poor access, and unstable ground conditions. Ultimately, this can help businesses to:<\/p>\n<ul>\n<li>Reduce risk of injury, fatality, or excavation-related incidents<\/li>\n<li>Avoid non-compliance with excavation, trenching, and workplace safety requirements<\/li>\n<li>Prevent service strikes involving gas, electrical, water, or communication lines<\/li>\n<li>Lower exposure to legal claims, enforcement action, and incident-related costs<\/li>\n<li>Reduce project delays caused by utility damage, emergency works, or shutdowns<\/li>\n<\/ul>","template_lp_business_opportunities":"<p>A well-prepared Excavation Permit helps businesses improve control over ground disturbance, trenching, and buried service work. Here are some ways a well-designed Excavation Permit can help businesses:<\/p>\n<ul>\n<li>Improve worker confidence before excavation work begins<\/li>\n<li>Strengthen contractor prequalification and tender competitiveness<\/li>\n<li>Improve coordination between supervisors, plant operators, utility locators, and site teams<\/li>\n<li>Build trust with clients, regulators, insurers, and project stakeholders<\/li>\n<\/ul>","template_lp_checklist_heading":"What Should Be Included in an Excavation Permit?","template_lp_checklist_content":"<p>An Excavation Permit should primarily include information on the work area, methodology, site hazards, safety controls implemented, and the approval or rejection of the permit. While requirements can vary across regions and project types, any good permit should include the following core components:<\/p>\n<ul>\n<li>Excavation scope of work including location, depth, dimensions, etc.<\/li>\n<li>Location and details of underground service conduits (if any), including utility drawings and service isolation information<\/li>\n<li>Ground & soil conditions<\/li>\n<li>Possible hazards to workers, equipment, or other third-party property<\/li>\n<li>Control measures such as shoring, benching, battering, barricades, and access points<\/li>\n<li>Responsible persons, inspection requirements, permit validity, and approval sign-off<\/li>\n<\/ul>","template_lp_extra_heading":"Why are Excavation Permits Important?","template_lp_extra_heading_content":"<p>Excavation Permits are important because excavation work can expose workers and nearby people to serious risks such as ground collapse, buried services, falling into open excavations, plant movement, and water ingress or infiltration. These hazards can change quickly depending on soil type, weather, excavation depth, vibration, nearby loads, and other site conditions.<br>\nOn construction, civil, utility, infrastructure, and maintenance projects, an Excavation Permit helps confirm that the site has been checked before the ground is broken. It also gives supervisors, operators, and workers a clear process for confirming service locations, installing ground support, controlling access, and stopping work if new hazards are found.<\/p>","template_lp_sbs_group":{"template_lp_step_by_step_title":"How to Create an Excavation Permit","template_lp_step_by_step_introduction":"<p>Creating a comprehensive excavation permit requires systematic assessment of site conditions, regulatory requirements, and safety measures. This process ensures all excavation work meets regulatory standards and local permit requirements.<\/p>","template_lp_step_by_step_subtitle":"Before creating an Excavation Permit, gather the following information:","template_lp_step_by_step_content":"<ul>\n<li>Site survey and utility location reports<\/li>\n<li>Soil classification and geotechnical data<\/li>\n<li>Local excavation permit requirements and municipal codes<\/li>\n<li>Project drawings showing excavation scope and dimensions<\/li>\n<li>Emergency contact information and evacuation procedures<\/li>\n<li>Qualified competent person assignments<\/li>\n<li>Available protective systems (shoring, sloping, or shielding equipment)<\/li>\n<\/ul>"},"template_lp_sbs_step_1_group":{"template_lp_sbs_step_1_header":"Start with Site and Excavation Permit Information","template_lp_sbs_step_1_content":"<p>Placing high-level general information at the beginning of the Excavation Permit helps users establish where the excavation will take place, what work is being approved, and who is involved in the activity. Here are some examples of core elements that you can use:<\/p>\n<ul>\n<li>Project name and site location<\/li>\n<li>Excavation permit number and validity period<\/li>\n<li>Description of excavation works<\/li>\n<li>Excavation location, depth, and dimensions<\/li>\n<li>Names and roles of workers and supervisors<\/li>\n<\/ul>"},"template_lp_sbs_repeater":[{"template_lp_sbs_repeater_title":"Assess the Excavation Hazards","template_lp_sbs_repeater_content":"<p>Another core element to an excavation permit is the identification of excavation hazards and potential risks before the work starts so the appropriate safety control measures can be implemented. Here are some common hazards that could be present at your job site that you should be aware of:<\/p>\n<ul>\n<li>Underground services, utilities, or buried structures<\/li>\n<li>Ground collapse or unstable soil conditions<\/li>\n<li>Water ingress or infiltration, flooding, or poor drainage<\/li>\n<li>Plant, vehicle, or pedestrian interaction near the excavation<\/li>\n<li>Fall hazards around open edges or access points<\/li>\n<\/ul>"},{"template_lp_sbs_repeater_title":"Confirm Utility Location and Ground Conditions","template_lp_sbs_repeater_content":"<p>After the hazards are identified, you will want to confirm that underground services and ground conditions have been checked before digging begins. For example, you will want to list the following information in your Excavation Permit:<\/p>\n<ul>\n<li>Service drawings or maps showing location of utility service conduits<\/li>\n<li>Test pitting, scanning, or trial hole results<\/li>\n<li>Protection measures for known service conduits beneath or around the excavation zone<\/li>\n<li>Soil type or ground condition around the excavation zone<\/li>\n<li>Other nearby structures that may be affected by the excavation<\/li>\n<\/ul>"},{"template_lp_sbs_repeater_title":"Record Excavation Method and Safety Controls","template_lp_sbs_repeater_content":"<p>Next, you will want to establish the appropriate excavation method and safety controls to reduce risks for your workers. This section should clearly show how the excavation will be carried out and protected during the work. Here are some examples of common safety controls you can implement:<\/p>\n<ul>\n<li>Excavation method, such as hand digging or mechanical excavation<\/li>\n<li>Shoring, benching, battering, or shielding of the excavation zone<\/li>\n<li>Barricades and warning signs in and around exclusion zones<\/li>\n<li>Safe access points to and from the work site<\/li>\n<\/ul>"},{"template_lp_sbs_repeater_title":"Set Out Inspection and Emergency Requirements","template_lp_sbs_repeater_content":"<p>It is important for inspection procedures and emergency procedures to be set before excavation work formally begins to avoid confusion at the job site. Be sure to document the following information in your permit:<\/p>\n<ul>\n<li>Inspection frequency and responsible person<\/li>\n<li>Checks after rain, vibration, or ground movement<\/li>\n<li>Emergency procedures and contact information<\/li>\n<\/ul>"}],"template_lp_sbs_final_group":{"template_lp_sbs_final_header":"Complete Approval, Monitoring, and Permit Closeout","template_lp_sbs_final_content":"<p>Complete the permit with a section where users can input approval to proceed, monitoring records, and a permit closeout section to confirm that the excavation work was completed. Be sure to include the following:<\/p>\n<ul>\n<li>Permit issuer and approver signatures<\/li>\n<li>Permit suspension or extension details, if applicable<\/li>\n<li>Final closeout signature and completion time<\/li>\n<\/ul>"},"template_lp_faq_1":"What is an Excavation Permit used for?","template_lp_faq_1_answer":"<p>An Excavation Permit is used to confirm that excavation work has been reviewed and approved before digging begins. Excavation permits usually record the work location, excavation depth, underground services, ground conditions, access and egress, protective systems, spoil placement, nearby structures, inspection requirements, and the people responsible for the work.<\/p>","template_lp_faq_2":"Are there any regulations or legislation on how to format an Excavation Permit?","template_lp_faq_2_answer":"<p>No, there are no explicit regulations that cover the formatting of an Excavation Permit. However, workplace safety laws commonly require excavation hazards to be assessed and controlled before work begins. An excavation permit should be checked against local excavation rules, utility locating requirements, permit-to-work procedures, and project safety requirements. For US-based teams, OSHA excavation permit searches usually relate to OSHA excavation standards and employer duties around trenching, protective systems, inspections, access, and underground utilities.<\/p>","template_lp_faq_3":"What requirements should be checked for an Excavation Permit?","template_lp_faq_3_answer":"<p>For Excavation Permits, teams should first verify the exact locations of underground service conduits, followed by the soil type, excavation depth, any presence of groundwater, access and egress points, and exclusion zones, among others. It is important that these checks are included in the excavation permit requirements and documented before workers or equipment enter the excavation area.<\/p>","template_lp_faq_4":"How should excavation controls be planned for deeper or higher-risk excavations?","template_lp_faq_4_answer":"<p>For excavations that are deeper or present higher risks, safety controls should be planned for collapse prevention, ground movement, possible water ingress or infiltration, and falling materials, among others. A sample excavation plan can help show how these controls can be implemented, which should also be included in any excavation permit template to help teams on the ground be aware of the hazards and said safety controls.<\/p>","template_lp_process_name":"Work Safety Management","template_lp_process_steps_content":"<p>Proper Work Safety Management allows site teams to easily track work, ensure workplace safety, and enforce safe work practices in a structure where documentation can easily be reviewed and shared.<\/p>","estimated_time":"25 minutes","template_lp_difficulty":"medium","template_lp_lower_sbs_step_1_group":{"template_lp_sbs_lower_step_1_header":"Start your Excavation Permit with Text Fields for General Information","template_lp_sbs_lower_step_1_content":"<p>It is important to begin your Excavation Permit with key permit, project, contractor, and work location details so the document can be traced to the correct excavation activity. This section should use simple text and date fields for fields such as:<\/p>\n<ul>\n<li>Text field or Automatic Form Counter for Permit Number<\/li>\n<li>Date and time selector fields for Permit Validity Start and End<\/li>\n<li>Text fields for Project \/ Site Name and Location<\/li>\n<li>Text field for Contractor Name<\/li>\n<\/ul>"},"template_lp_lower_sbs_repeater":[{"template_lp_lower_sbs_repeater_title":"Create a Section for Excavation Work Scope","template_lp_lower_sbs_repeater_content":"<p>Next, create a section where users can describe the excavation activity, excavation type, expected depth, and method of excavation. For simplicity, we recommend using the following fields:<\/p>\n<ul>\n<li>Multi-line text field for Scope of Works<\/li>\n<li>Dropdown field for Excavation Type<\/li>\n<li>Number field for Estimated Depth of Excavation<\/li>\n<li>Multiple-choice selector field for Excavation Method<\/li>\n<\/ul>"},{"template_lp_lower_sbs_repeater_title":"Create a Table for Hazards and Safety Controls","template_lp_lower_sbs_repeater_content":"<p>Users will next need to list the possible hazards, potential impacts, safety controls, and remaining risk level for the excavation work. We highly recommend using a table for this section, with the following formatting for the columns:<\/p>\n<ul>\n<li>First column for Possible Hazard<\/li>\n<li>Second column for Potential Impact<\/li>\n<li>Third column for Required Safety Controls<\/li>\n<li>Fourth column for Residual Risk Impact<\/li>\n<li>Fifth column for Comments<\/li>\n<\/ul>"},{"template_lp_lower_sbs_repeater_title":"Add Sections for Photos, Documentation, and Worker Sign-off","template_lp_lower_sbs_repeater_content":"<p>After the hazard control section, add fields where users can attach visual evidence and confirm that workers have been briefed before excavation starts. Be sure to add the following fields:<\/p>\n<ul>\n<li>Photo upload field for Photos<\/li>\n<li>Attachment upload field for supporting drawings, service plans, permits, or utility locating documents<\/li>\n<li>Pre-filled text field for Worker Sign-off acknowledgement statement<\/li>\n<li>Scan ID field for Worker Sign-off<\/li>\n<li>Manual sign-off table with columns for Name, Company, Signature, Date, Time, Latitude, and Longitude<\/li>\n<\/ul>"}],"template_lp_lower_sbs_final_group":{"template_lp_lower_sbs_final_title":"End your Excavation Permit with Permit Sign-off, Approval, and Closeout","template_lp_lower_sbs_final_content":"<p>Finally, complete the Excavation Permit with sign-off fields for the permit creator, approval personnel, and closeout confirmation. If your app or software allows, use automatic e-signature fields and include fields like:<\/p>\n<ul>\n<li>Pre-filled text field for Permit Creator Sign-off statement<\/li>\n<li>E-signature field for Permit Created by<\/li>\n<li>Pre-filled text field for Permit Approval statement<\/li>\n<li>E-signature field for Permit Approval<\/li>\n<li>Pre-filled text field for Permit Closeout statement, with e-signature field and automatic date and time stamp<\/li>\n<\/ul>"},"template_lp_author_select":[{"template_lp_content_author_id_select":"50007"}],"template_lp_published":{"date":"15 June 2026","version":"v26-06-v1","author":"Ron","description":"Migrated from legacy BB page, updates to the template demo, rewritten to conform with global standards and QA standards."},"template_lp_revisions":null,"template_lp_type_of_form":"permit","template_lp_type_of_form_content":"<p>This permit was generated using Dashpivot, where your teams can quickly create work permits in just a few clicks, complete with smart tables, checklists, photo and file attachments, and even automated sign-offs.<\/p>","template_lp_script_template_name":"excavation-permit","template_lp_script_template_id":"5b400af874f969121af9e857","template_lp_relevant_app_button":"https:\/\/sitemate.com\/safety\/permit-to-work-app\/","template_lp_relevant_app_photo_1":"https:\/\/sitemate.com\/wp-content\/uploads\/2023\/02\/Permit-to-work-form.svg","template_lp_difficulty_selector":"50385"},"custom_permalink":"templates\/safety\/forms\/excavation-permit-template","_links":{"self":[{"href":"https:\/\/sitemate.com\/au\/wp-json\/wp\/v2\/posts\/54232","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sitemate.com\/au\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sitemate.com\/au\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sitemate.com\/au\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/sitemate.com\/au\/wp-json\/wp\/v2\/comments?post=54232"}],"version-history":[{"count":1,"href":"https:\/\/sitemate.com\/au\/wp-json\/wp\/v2\/posts\/54232\/revisions"}],"predecessor-version":[{"id":54233,"href":"https:\/\/sitemate.com\/au\/wp-json\/wp\/v2\/posts\/54232\/revisions\/54233"}],"acf:attachment":[{"embeddable":true,"href":"https:\/\/sitemate.com\/au\/wp-json\/wp\/v2\/media\/54226"},{"embeddable":true,"href":"https:\/\/sitemate.com\/au\/wp-json\/wp\/v2\/media\/54230"},{"embeddable":true,"href":"https:\/\/sitemate.com\/au\/wp-json\/wp\/v2\/media\/54229"},{"embeddable":true,"href":"https:\/\/sitemate.com\/au\/wp-json\/wp\/v2\/media\/54228"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sitemate.com\/au\/wp-json\/wp\/v2\/media\/54226"}],"wp:attachment":[{"href":"https:\/\/sitemate.com\/au\/wp-json\/wp\/v2\/media?parent=54232"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sitemate.com\/au\/wp-json\/wp\/v2\/categories?post=54232"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sitemate.com\/au\/wp-json\/wp\/v2\/tags?post=54232"},{"taxonomy":"industry","embeddable":true,"href":"https:\/\/sitemate.com\/au\/wp-json\/wp\/v2\/industry?post=54232"},{"taxonomy":"product","embeddable":true,"href":"https:\/\/sitemate.com\/au\/wp-json\/wp\/v2\/product?post=54232"},{"taxonomy":"region","embeddable":true,"href":"https:\/\/sitemate.com\/au\/wp-json\/wp\/v2\/region?post=54232"},{"taxonomy":"system","embeddable":true,"href":"https:\/\/sitemate.com\/au\/wp-json\/wp\/v2\/system?post=54232"},{"taxonomy":"content_type","embeddable":true,"href":"https:\/\/sitemate.com\/au\/wp-json\/wp\/v2\/content_type?post=54232"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}