{"id":57081,"date":"2026-09-24T04:54:33","date_gmt":"2026-09-24T04:54:33","guid":{"rendered":"https:\/\/sitemate.com\/pipe-laying-safe-work-method-statement\/"},"modified":"2026-10-21T10:12:18","modified_gmt":"2026-10-21T10:12:18","slug":"pipe-laying-safe-work-method-statement","status":"publish","type":"post","link":"https:\/\/sitemate.com\/de\/templates\/safety\/forms\/safe-work-method-statement-pipe-laying\/","title":{"rendered":"Pipe Laying Safe Work Method Statement"},"content":{"rendered":"","protected":false},"excerpt":{"rendered":"","protected":false},"author":12,"featured_media":56208,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","rank_math_title":"Pipe Laying Safe Work Method Statement | Sitemate","rank_math_description":"Free Pipe Laying Safe Work Method Statement template. Document hazards, control measures & procedures for pipe laying activities. Download and customise today.","rank_math_canonical_url":"","rank_math_focus_keyword":"Pipe Laying Safe Work Method Statement "},"categories":[147],"tags":[],"industry":[123],"product":[78],"region":[80],"system":[87],"content_type":[99],"topic":[174],"class_list":["post-57081","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-migration","industry-civil-construction","product-dashpivot","region-aus","system-safety","content_type-template-landing-page","topic-swms"],"acf":{"template_lp_template_name":"Pipe Laying Safe Work Method Statement ","template_lp_gallery_repeater":null,"template_lp_template_introduction":"<p>Need a Pipe Laying Safe Work Method Statement your crew can pick up and use straight away? This template comes pre-written with the key sections you need, including high-risk pipe laying activities, associated hazards, and the control measures used to reduce their likelihood and impact, so there is no starting from scratch. You can edit any part of it to reflect your company's specific workflows, site conditions, and safety procedures, while the document still holds up against the regulatory requirements you would be audited on.<\/p>\n<p>This Pipe Laying Safe Work Method Statement, or Pipe Laying SWMS, is an easy-to-use form that your workers can use to identify and record the specific high-risk tasks involved in pipe laying, document the hazards linked to those tasks, and outline the control measures and safe work procedures needed to carry out the work safely. The form also includes a notification system that can be configured to alert relevant stakeholders as soon as a completed SWMS is submitted, helping to ensure that all safety measures are communicated and in place before any pipe laying activity begins.<\/p>","template_lp_template_name_abbreviation":"","template_lp_function":"Safety","template_lp_function_url":"","template_lp_template_image_cover":"https:\/\/sitemate.com\/wp-content\/uploads\/2026\/09\/Pipe-Laying-Safe-Work-Method-Statement-page-01-scaled.jpg","template_image_gallery_repeater_url":[56208,56209,56210,56211,56212,56213],"template_lp_what_is_description":"<p>A Pipe Laying Safe Work Method Statement (SWMS) is a legal document needed for any industry that performs pipe laying activities. It is used to record specific high-risk pipe-laying works, identify the hazards linked to those activities, and then create control measures to reduce the likelihood and impact of any or all hazards. The pipe laying SWMS gives the company and workers a deeper understanding of the procedures and workflows needed to conduct work safely.<\/p>","template_lp_template_variation_name":"Safe Work Method Statement for Pipe Laying","template_lp_document_comparison_header":"Compare this Pipe Laying Safe Work Method Statement to paper-based forms created from Word, Excel, or PDF","template_lp_document_comparison_content":"<p>Curious how this Pipe Laying Safe Work Method Statement works? Check out the example below to see exactly what the form looks like and how it captures everything from high-risk pipe laying tasks through to hazard identification and control measures. You can export it as your own custom form and fill in your company details, site-specific information, and safety procedures to have a ready-to-use Pipe Laying SWMS in minutes.<\/p>","template_url_dashpivot_url":"https:\/\/dashpivot.com\/embed\/library-apps\/5d800ef20d25ad1fa0e0b344","template_lp_applicable_standards_content":"<p>Pipe-laying activities can put employees in situations close to harm if they do not control hazards properly. Establishing a safe work method statement ensures that these hazards are identified and provided with appropriate safety control measures, allowing employees to safely perform their work from start to finish. Additionally, having a SWMS form for pipe-laying helps companies stay compliant with the following standards in Australia and New Zealand:<\/p>\n<ul>\n<li>WHS Regulation 2011, Regulation 40\u2014This provision imposes a duty on employers to provide a safe and healthy working environment for all employees.<\/li>\n<li>WHS Regulation 2011, Regulation 299\u2014This provision in Australia requires establishments to create a Safe Work Method Statement for high-risk construction work.<\/li>\n<li>WHS Regulation 2011, Regulation 291\u2014This regulation is a provision in Australia that defines and classifies high-risk construction work.<\/li>\n<li>Health and Safety at Work Act (HSWA) 2015, section 30\u2014This legislation is a provision in New Zealand that describes the requirements to control risks that affect health and safety.<\/li>\n<li>Health and Safety at Work Act (HSWA) 2015, section 36\u2014This legislation is a provision in New Zealand that requires persons conducting a business or undertaking to ensure the health and safety of workers affected by the hazards found at work.<\/li>\n<\/ul>","template_lp_staff_members_and_parties_content":"<p>The effectiveness of creating and completing a Pipe Laying Safe Work Method Statement relies heavily on the involvement of the following staff members:<\/p>\n<ul>\n<li>Site Manager: Their role includes planning and managing safety in the workplace, which is why it is their responsibility to implement the SWMS. They review and approve the SWMS, especially for high-risk activities.<\/li>\n<li>Workforce: The workforce directly faces the hazards. Part of their duty is to guarantee that they perform the provided method statement; therefore, their participation in creating and completing the pipe-laying SWMS is essential. Their exposure and firsthand knowledge of the hazards also enable them to provide diverse perspectives on the observable hazards they encounter while performing their activities.<\/li>\n<li>Safety Officers: These are the individuals who assess the effectiveness and efficiency of controls offered in all activities, particularly those in which employees work in hazardous conditions. It is their responsibility to guarantee that safety management measures are adequate and sufficient to protect all workers engaging in high-risk activities.<\/li>\n<\/ul>","template_lp_business_risks_content":"<p>Keeping everyone safe also means keeping the business safe. Employers must commit to the duty to protect the business against various hazards, in addition to the employees, who are the company's lifeblood. Committing to the practice of implementing a SWMS for pipe laying reduces the following business risks:<\/p>\n<ul>\n<li>Increased expense due to accidents and injuries<\/li>\n<li>Increased expense owing to non-compliance with regulations<\/li>\n<li>Increased rate of lost time incidents (LTI)<\/li>\n<li>Delayed timetables and deadlines<\/li>\n<li>Negative impact on company reputation<\/li>\n<\/ul>","template_lp_business_opportunities":"<p>The Pipe Laying Safe Work Method Statement can provide all the necessary safety measures to adequately safeguard employees from potential hazards while performing their daily activities. However, compliance with this document provides more than just protection. Businesses can greatly benefit from this simple yet effective tool. Compliance with this document creates the following commercial opportunities:<\/p>\n<ul>\n<li>More cost savings over time<\/li>\n<li>Lower insurance premiums<\/li>\n<li>Stronger relationships among employers, employees, and stakeholders<\/li>\n<li>Better output quality<\/li>\n<li>Enhanced company reputation<\/li>\n<\/ul>","template_lp_checklist_heading":"What does the Pipe Laying Safe Work Method Statement eliminate?","template_lp_checklist_content":"<p>The Pipe Laying Safe Work Method Statement ensures the following problems are removed:<\/p>\n<ul>\n<li>Unidentified hazards<\/li>\n<li>Uncontrolled risks<\/li>\n<li>Unclear work procedures<\/li>\n<li>Miscommunication<\/li>\n<li>Unsafe work methods<\/li>\n<li>No clear responsibilities<\/li>\n<li>Improper PPE<\/li>\n<li>Panic during emergencies<\/li>\n<\/ul>","template_lp_extra_heading":"Pipe Laying Safe Work Method Statement: Managing Pipe Laying Hazards","template_lp_extra_heading_content":"<p>Pipe laying can involve excavation, heavy pipes, lifting equipment, mobile plant, underground services, and workers operating around trenches. Workers can be exposed to risks such as trench collapse, falls into excavations, falling or rolling pipes, crush injuries, and strains from handling heavy or awkward materials. Excavation work can also create hazards from unstable ground, water ingress, buried services, and moving plant operating near the work area. Pipes and equipment may be difficult to position safely, particularly when working in confined spaces or uneven ground. A Pipe Laying Safe Work Method Statement helps identify these dangers and establish suitable controls for excavation, pipe handling, lifting, positioning, joining, backfilling, and other stages of the work.<\/p>","template_lp_sbs_group":{"template_lp_step_by_step_title":"How to create a Pipe Laying Safe Work Method Statement","template_lp_step_by_step_introduction":"<p>Creating an effective safe work method statement requires systematic planning and input from multiple stakeholders. Follow these steps to develop a comprehensive SWMS using this editable template.<\/p>","template_lp_step_by_step_subtitle":"Prerequisites for creating a Pipe Laying Safe Work Method Statement","template_lp_step_by_step_content":"<ul>\n<li>Detailed work scope and activity descriptions<\/li>\n<li>Site drawings<\/li>\n<li>Relevant safety data sheets for materials<\/li>\n<li>Previous incident reports or lessons learned<\/li>\n<li>Applicable safety regulations and standards<\/li>\n<li>Worker competency and training records<\/li>\n<li>Emergency contact information and procedures<\/li>\n<\/ul>"},"template_lp_sbs_step_1_group":{"template_lp_sbs_step_1_header":"Add a section for project details","template_lp_sbs_step_1_content":"<p>This section provides an overview of what the SWMS is for. It should have the following fields:<\/p>\n<ul>\n<li>Project name<\/li>\n<li>Project location<\/li>\n<li>Activity date<\/li>\n<li>Activity<\/li>\n<li>Activity scope<\/li>\n<\/ul>"},"template_lp_sbs_repeater":[{"template_lp_sbs_repeater_title":"Add a roles and responsibilities section","template_lp_sbs_repeater_content":"<p>This section provides the details of each role and responsibility. The following fields should be present:<\/p>\n<ul>\n<li>Name of employee<\/li>\n<li>Role<\/li>\n<li>Responsibilities<\/li>\n<li>Certifications<\/li>\n<\/ul>"},{"template_lp_sbs_repeater_title":"Create a hazard and control section","template_lp_sbs_repeater_content":"<p>This section records the identified hazards and the needed control measures. It should have the following fields:<\/p>\n<ul>\n<li>Task\/procedure<\/li>\n<li>Identified hazard<\/li>\n<li>Severity of hazard<\/li>\n<li>Control measures<\/li>\n<li>New safe procedures<\/li>\n<\/ul>"},{"template_lp_sbs_repeater_title":"Add a PPE requirement and emergency procedure section","template_lp_sbs_repeater_content":"<p>This section provides a list of the PPE needed for the activity and the emergency protocols.<\/p>\n<ul>\n<li>Provide a field for all the needed PPE for the activity<\/li>\n<li>Add another field for the emergency procedures and contacts<\/li>\n<\/ul>"}],"template_lp_sbs_final_group":{"template_lp_sbs_final_header":"Add a sign-off section","template_lp_sbs_final_content":"<p>The following signatures should be present to validate the SWMS:<\/p>\n<ul>\n<li>Person who prepared the SWMS<\/li>\n<li>Person who approves the SWMS<\/li>\n<\/ul>"},"template_lp_faq_1":"Who completes the Pipe Laying Safe Work Method Statement template?","template_lp_faq_1_answer":"<p>The template should be completed by a competent person who understands pipe laying, excavation activities, worksite conditions, equipment, and the associated hazards. This may be a supervisor, site manager, safety professional, or suitably qualified worker.<\/p>","template_lp_faq_2":"When should the Pipe Laying Safe Work Method Statement template be completed?","template_lp_faq_2_answer":"<p>The template should be completed before pipe laying work begins. This allows the excavation, equipment, materials, work area, hazards, and control measures to be reviewed before workers start.<\/p>","template_lp_faq_3":"Who should review the completed Pipe Laying Safe Work Method Statement?","template_lp_faq_3_answer":"<p>The completed template should be reviewed by the responsible supervisor or another competent person before work begins. The review should confirm that the documented hazards, work methods, and controls are suitable for the project.<\/p>","template_lp_faq_4":"Can the Pipe Laying Safe Work Method Statement template be reused?","template_lp_faq_4_answer":"<p>Yes. The template can be used as a starting point for similar pipe-laying activities, but the project details, excavation conditions, pipe types, equipment, hazards, risk ratings, and control measures should be reviewed and updated for each new project.<\/p>","template_lp_process_name":"Pipe Laying Safe Work Method Statement Process","template_lp_process_steps_content":"<p>A well-designed digital Pipe Laying Safe Work Method Statement ensures automated compliance tracking and mobile accessibility that traditional paper-based systems cannot match. These platforms enable immediate updates to safety procedures, instant communication of changes to all relevant personnel, and comprehensive audit trails that demonstrate regulatory compliance.<\/p>","estimated_time":"20 minutes","template_lp_difficulty":"medium","template_lp_lower_sbs_step_1_group":{"template_lp_sbs_lower_step_1_header":"How to create a Pipe Laying Safe Work Method Statement in an app?","template_lp_sbs_lower_step_1_content":"<p>Using an app that employs digital forms instead of paper-based ones may help improve the process by:<\/p>\n<ul>\n<li>AI assistance<\/li>\n<li>Having fewer manual data entries<\/li>\n<li>All produced forms are stored in a single-access cloud<\/li>\n<li>Reformatting is straightforward and can be adapted to new protocols or updated standards.<\/li>\n<li>Formula integration is much simpler<\/li>\n<li>Workflows and notifications may be automated and scheduled<\/li>\n<li>Improved template design and look<\/li>\n<\/ul>"},"template_lp_lower_sbs_repeater":[{"template_lp_lower_sbs_repeater_title":"Formatting the project details section","template_lp_lower_sbs_repeater_content":"<ul>\n<li>Add a text field to allow users to input a project name.<\/li>\n<li>Add another text field to allow users to input the project location.<\/li>\n<li>Provide a date field for the activity date.<\/li>\n<li>Add a text field for the activity.<\/li>\n<li>Add a multiple-text field for the activity scope.<\/li>\n<\/ul>"},{"template_lp_lower_sbs_repeater_title":"Formatting the roles and responsibilities section","template_lp_lower_sbs_repeater_content":"<ul>\n<li>Add a 5-column table where users can freely add rows.<\/li>\n<li>Use the following headers for each column: name, role, responsibilities, certified, and certification.<\/li>\n<li>Format columns one, two, and three as text fields so that users can input the names, roles, and responsibilities.<\/li>\n<li>Format column 4 as a selection field to provide the users with options if the employee requires a certification for the role. Each selection item can be provided with colors to make the form more appealing.<\/li>\n<li>Format column 5 as an attachment field to allow users to upload the relevant certification.<\/li>\n<\/ul>"},{"template_lp_lower_sbs_repeater_title":"Formatting the safe work method statement section","template_lp_lower_sbs_repeater_content":"<ul>\n<li>Provide an 8-column table where users can freely add rows.<\/li>\n<li>Provide these as headers for each column: procedure, procedure description, possible hazards, likelihood, severity, risk score, control measures, and corrected procedure.<\/li>\n<li>Format the first, second, and third columns as a text field to allow users to input the procedure, procedure description, and possible hazards, respectively.<\/li>\n<li>Format the fourth and fifth columns as selection fields to provide the users with options for the likelihood and severity score of each identified hazard. Each selection item can be integrated with colors to make the form more professional. Selection items are 1, 2, 3, 4, and 5.<\/li>\n<li>Format the sixth column as a formula field to automatically calculate the risk score of the hazard. The resulting value should follow this formula: Risk score = Likelihood score x Severity score<\/li>\n<li>Format the seventh and eighth columns as text fields to allow users to input the appropriate control measure and the corrected procedures, respectively.<\/li>\n<li>Add a multiple-text field after the table to allow users to input all the required PPE for the activity.<\/li>\n<\/ul>"}],"template_lp_lower_sbs_final_group":{"template_lp_lower_sbs_final_title":"Formatting the signatory section","template_lp_lower_sbs_final_content":"<ul>\n<li>Provide a signature field for the person who prepares the SWMS.<\/li>\n<li>Another signature field should be provided for the person who will approve the SWMS.<\/li>\n<\/ul>"},"template_lp_author_select":[{"template_lp_content_author_id_select":"49985"}],"template_lp_published":{"date":"18 September 2026","version":"25-11-v2","author":"Felmar","description":"Rewrote the guide for clarity and accuracy."},"template_lp_revisions":null,"template_lp_type_of_form":"form","template_lp_type_of_form_content":"<p>This comprehensive safety planning form was developed using Dashpivot's digital form builder, incorporating industry best practices for workplace risk management and regulatory compliance. The template structure follows Work Health and Safety Act requirements while providing flexibility for industry-specific customization and real-time collaboration capabilities.<\/p>","template_lp_script_template_name":"pipe-laying-safe-work-method-statement","template_lp_script_template_id":"5d800ef20d25ad1fa0e0b344","template_lp_relevant_app_button":"https:\/\/sitemate.com\/safety\/safe-work-method-statement-app\/","template_lp_relevant_app_photo_1":"https:\/\/sitemate.com\/wp-content\/uploads\/2020\/11\/Frame-169.svg","template_lp_difficulty_selector":"50385","template_lp_breadcrumb":"","template_lp_breadcrumb_schema":"","template_lp_related_html":"<div class=\"sm-related\"><h2 class=\"section-title\">Related apps and templates<\/h2><div class=\"custom-grid\">\n  <a class=\"bento-col is-linkcard is-flush custom-col-4\" href=\"\/safety\/safe-work-method-statement-app\/\"><div class=\"card-media is-app-form\"><img src=\"\/wp-content\/uploads\/2026\/09\/safety-method-statement.webp\" alt=\"\" loading=\"lazy\"><\/div><div class=\"card-body\"><span class=\"stack\"><span class=\"eyebrow-sm\">App<\/span><h3 class=\"card-title\">Safe Work Method Statement App<\/h3><p class=\"card-excerpt clamp-2\">Sitemate\u2019s safe work method statement app template helps supervisors draft, review, sign off, and store SWMS fast. Try free \u2014 no credit card<\/p><\/span><span class=\"learn-more-btn\">View app <img src=\"\/wp-content\/uploads\/2025\/07\/grey-arrow.svg\" alt=\"\"><\/span><\/div><\/a>\n  <a class=\"bento-col is-linkcard is-flush custom-col-4\" href=\"\/templates\/safety\/forms\/safe-work-method-statement-excavation\/\"><div class=\"card-media\"><img src=\"\/wp-content\/uploads\/2026\/06\/Excavation-Safe-Work-Method-Statement-page-01-scaled.jpg\" alt=\"\" loading=\"lazy\"><\/div><div class=\"card-body\"><span class=\"stack\"><span class=\"eyebrow-sm\">Template<\/span><h3 class=\"card-title\">Excavation Safe Work Method Statement<\/h3><p class=\"card-excerpt clamp-2\">This free Excavation Safe Work Method Statement is comprehensively designed to ensure excavation activities are safely conducted and are compliant with safety regulations. The template also features easy-to-fill fields,<\/p><\/span><span class=\"learn-more-btn\">View template <img src=\"\/wp-content\/uploads\/2025\/07\/grey-arrow.svg\" alt=\"\"><\/span><\/div><\/a>\n  <a class=\"bento-col is-linkcard is-flush custom-col-4\" href=\"\/templates\/safety\/forms\/excavation-risk-assessment\/\"><div class=\"card-media\"><img src=\"\/wp-content\/uploads\/2026\/04\/Excavation-Risk-Assessment-Method-Statement-page-1-scaled.jpg\" alt=\"\" loading=\"lazy\"><\/div><div class=\"card-body\"><span class=\"stack\"><span class=\"eyebrow-sm\">Template<\/span><h3 class=\"card-title\">Risk Assessment for Excavation<\/h3><p class=\"card-excerpt clamp-2\">This free and downloadable Risk Assessment for Excavation template is fully ready to help streamline the risk assessment process, since it provides a more structured and targeted checklist, considers environmental<\/p><\/span><span class=\"learn-more-btn\">View template <img src=\"\/wp-content\/uploads\/2025\/07\/grey-arrow.svg\" alt=\"\"><\/span><\/div><\/a>\n<\/div><\/div>"},"custom_permalink":"templates\/safety\/forms\/safe-work-method-statement-pipe-laying","_links":{"self":[{"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/posts\/57081","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/comments?post=57081"}],"version-history":[{"count":1,"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/posts\/57081\/revisions"}],"predecessor-version":[{"id":57082,"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/posts\/57081\/revisions\/57082"}],"acf:attachment":[{"embeddable":true,"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/media\/56213"},{"embeddable":true,"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/media\/56212"},{"embeddable":true,"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/media\/56211"},{"embeddable":true,"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/media\/56210"},{"embeddable":true,"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/media\/56209"},{"embeddable":true,"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/media\/56208"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/media\/56208"}],"wp:attachment":[{"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/media?parent=57081"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/categories?post=57081"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/tags?post=57081"},{"taxonomy":"industry","embeddable":true,"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/industry?post=57081"},{"taxonomy":"product","embeddable":true,"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/product?post=57081"},{"taxonomy":"region","embeddable":true,"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/region?post=57081"},{"taxonomy":"system","embeddable":true,"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/system?post=57081"},{"taxonomy":"content_type","embeddable":true,"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/content_type?post=57081"},{"taxonomy":"topic","embeddable":true,"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/topic?post=57081"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}