{"id":59913,"date":"2026-11-17T05:04:21","date_gmt":"2026-11-17T05:04:21","guid":{"rendered":"https:\/\/sitemate.com\/ev-charging-infrastructure-report\/"},"modified":"2026-11-17T05:11:54","modified_gmt":"2026-11-17T05:11:54","slug":"ev-charging-infrastructure-report","status":"publish","type":"post","link":"https:\/\/sitemate.com\/de\/templates\/environmental\/forms\/ev-charging-infrastructure-report-template\/","title":{"rendered":"EV Charging Infrastructure Report"},"content":{"rendered":"","protected":false},"excerpt":{"rendered":"","protected":false},"author":18,"featured_media":47818,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","rank_math_title":"Free EV Charging Infrastructure Report Template | Sitemate","rank_math_description":"Download a free EV Charging Infrastructure Report template for contractors. Document compliance, defects & inspections digitally. Try it free today.","rank_math_canonical_url":"","rank_math_focus_keyword":"EV Charging Infrastructure Report"},"categories":[147],"tags":[],"industry":[],"product":[78],"region":[145],"system":[86],"content_type":[99,175],"topic":[176],"class_list":["post-59913","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-migration","product-dashpivot","region-global","system-field-reporting","content_type-template-landing-page","content_type-template-lp-conversion-test-wave-2","topic-field-reporting"],"acf":{"template_lp_template_name":"EV Charging Infrastructure Report","template_lp_gallery_repeater":null,"template_lp_template_introduction":"<p>Reporting on EV charging infrastructure for your construction project, facility, or development? Looking for an EV charging infrastructure report sample to help guide your own reporting process? <br>\nThis EV Charging Infrastructure Report is an easy-to-use form that your team can use to record and assess electric vehicle charging infrastructure across project sites, buildings, and facilities. Record important details such as the site location, charger type, charging capacity, power supply, installation status, equipment condition, testing results, maintenance activities, and identified issues, then attach supporting photos, files, and sign-offs - all in one free form. Plus, you can even export your completed reports to PDF or CSV for easy sharing with engineers, contractors, facility managers, and other stakeholders.<\/p>","template_lp_template_name_abbreviation":"","template_lp_function":"Field Reporting","template_lp_function_url":"","template_lp_template_image_cover":"https:\/\/sitemate.com\/wp-content\/uploads\/2025\/11\/EV-Infrastructure-Compliance-Report-page-001-scaled.jpg","template_image_gallery_repeater_url":[47818,47819,47820],"template_lp_what_is_description":"<p>An EV Charging Infrastructure Report is a document used by engineers, project managers, electrical contractors, and facility managers to record and assess the installation, condition, and performance of electric vehicle charging systems. This report usually includes details on charging station locations, charger types, power capacity, electrical connections, equipment condition, testing results, maintenance records, and identified issues.<br>\nDue to the growing demand for electric vehicles and reliable charging facilities, proper infrastructure reporting is important for identifying equipment faults, electrical safety risks, capacity limitations, and maintenance requirements. This makes EV Charging Infrastructure Reports highly relevant in construction, infrastructure, property development, transport, utilities, and commercial facilities where EV charging stations are installed, operated, or maintained.<\/p>","template_lp_template_variation_name":"EV Charging Infrastructure Report Form","template_lp_document_comparison_header":"Compare this EV Charging Infrastructure Report to reports made on other formats","template_lp_document_comparison_content":"<p>Curious how this report works? Check out the example below to see how you can generate your own version, export it as a custom form with your company details, and fill in your information to have a ready-to-use EV Charging Infrastructure Report Form in minutes. No more starting from scratch like you would on Excel or Word based forms.<\/p>","template_url_dashpivot_url":"https:\/\/dashpivot.com\/embed\/library-apps\/6911b39d373240f908f198b5","template_lp_applicable_standards_content":"<p>There are generally no explicit universal formatting requirements for an EV Charging Infrastructure Report. However, most electrical safety and infrastructure regulations require businesses to document charging equipment, installation safety, electrical capacity, and operational performance. An EV Charging Infrastructure Report is a good document to support compliance with these requirements. Here are examples of common standards and regulations referenced around the world:<\/p>\n<ul>\n<li>IEC 61851-1:2017 covers general safety requirements for EV charging equipment<\/li>\n<li>IEC 60364-7-722:2018 covers electrical installations supplying electric vehicles<\/li>\n<li>NFPA 70 National Electrical Code covers EV charging electrical installations in the USA<\/li>\n<li>EU Regulation 2023\/1804 covers public EV charging infrastructure and related data requirements in Europe<\/li>\n<li>Local electrical and building codes commonly require safe installation, testing, and inspection of EV chargers<\/li>\n<\/ul>","template_lp_staff_members_and_parties_content":"<p>An EV Charging Infrastructure Report is primarily used by businesses and project teams that manage the planning, installation, inspection, maintenance, and performance of electric vehicle charging facilities. Here are examples of common parties that use an EV Charging Infrastructure Report:<\/p>\n<ul>\n<li>Project managers and site engineers<\/li>\n<li>Electrical engineers and EV charging installers<\/li>\n<li>Facility managers and property owners<\/li>\n<li>EV charging network operators<\/li>\n<li>Clients and infrastructure investors<\/li>\n<\/ul>","template_lp_business_risks_content":"<p>Using an EV Charging Infrastructure Report helps businesses identify issues such as insufficient electrical capacity, faulty charging equipment, poor installation practices, and unexpected maintenance requirements before they develop into more serious problems. Without proper infrastructure assessments and documentation, businesses may be exposed to risks such as:<\/p>\n<ul>\n<li>Electrical faults, fire hazards, and charging equipment failures<\/li>\n<li>Non-compliance with electrical safety and installation requirements<\/li>\n<li>Unexpected installation costs and infrastructure upgrades<\/li>\n<li>Charger downtime and poor charging service availability<\/li>\n<li>Project delays caused by equipment failures, inspections, or grid connection issues<\/li>\n<\/ul>","template_lp_business_opportunities":"<p>A well-prepared EV Charging Infrastructure Report helps businesses improve infrastructure planning, charging performance, and investment decisions across different sites and facilities. Here are some ways an EV Charging Infrastructure Report can help businesses:<\/p>\n<ul>\n<li>Identify opportunities to expand EV charging capacity based on demand<\/li>\n<li>Improve charger reliability and maintenance planning<\/li>\n<li>Support better investment decisions through charging usage and performance data<\/li>\n<li>Build client and investor confidence through documented infrastructure performance<\/li>\n<\/ul>","template_lp_checklist_heading":"What Should be Included in an EV Charging Infrastructure Report?","template_lp_checklist_content":"<p>There are no single global requirements that cover the exact format of an EV Charging Infrastructure Report. Rather, reporting requirements can vary depending on the region, project type, charging network, and applicable electrical and infrastructure standards. However, there are some core elements that are typically included that you should know about:<\/p>\n<ul>\n<li>Site details such as project location, reporting period, charging station operator, and responsible persons<\/li>\n<li>Charging infrastructure details including charger types, number of charging points, power ratings (kW), and electrical supply capacity<\/li>\n<li>Installation and commissioning status, electrical inspection results, equipment testing, and outstanding works<\/li>\n<li>Charging performance metrics such as energy delivered (kWh), charging sessions, equipment uptime, and station usage<\/li>\n<li>Equipment faults, maintenance activities, safety issues, corrective actions, and future infrastructure requirements<\/li>\n<\/ul>","template_lp_extra_heading":"What Performance Metrics Should be Tracked for EV Charging Stations?","template_lp_extra_heading_content":"<p>EV charging stations should be monitored regularly to assess their reliability, usage, energy consumption, and overall operating performance. This is especially important for public charging networks, commercial facilities, and transport infrastructure projects where equipment faults, power supply issues, and high demand can affect charging availability. Common performance metrics include charger uptime and availability (%), energy delivered (kWh), number of charging sessions, average charging duration, and charger usage rates. Additionally, operators should track charging success rates, equipment faults, maintenance response times, and peak power demand (kW) to assess station performance and identify areas that require improvement. <br>\nEssentially, an EV Charging Infrastructure Report helps project management teams track installation progress, assess charger performance, and identify equipment or electrical issues that require attention. Additionally, it provides clear documentation of infrastructure conditions, testing results, and maintenance activities, supporting future upgrades, asset management, and compliance with relevant electrical safety and project requirements.<\/p>","template_lp_sbs_group":{"template_lp_step_by_step_title":"How to Create an EV Charging Infrastructure Report","template_lp_step_by_step_introduction":"<p>Creating an EV Charging Infrastructure Report will need careful planning and knowledge of different charging applications and even on the EVs themselves. In this section, we discuss important steps so you can create your own report from scratch.<\/p>","template_lp_step_by_step_subtitle":"Before starting your EV Charging Infrastructure Report form, the following pre-requisites should be ready.","template_lp_step_by_step_content":"<ul>\n<li>Project or site details are required.<\/li>\n<li>Charging station locations and equipment types must be listed.<\/li>\n<li>Charger capacity, power ratings, and connector types must be recorded.<\/li>\n<li>Electrical supply and grid connection details must be available.<\/li>\n<li>Installation, inspection, and testing records must be included.<\/li>\n<li>Charger usage, availability, and performance data must be recorded.<\/li>\n<li>Safety, maintenance, and compliance details must be documented.<\/li>\n<\/ul>"},"template_lp_sbs_step_1_group":{"template_lp_sbs_step_1_header":"Start with Project and Infrastructure Information","template_lp_sbs_step_1_content":"<p>Recording general project information at the beginning of your EV Charging Infrastructure Report helps establish context for the charging infrastructure being assessed. Here are some examples of core information that you should include:<\/p>\n<ul>\n<li>Project name and site location<\/li>\n<li>Reporting date and period<\/li>\n<li>Charging station owner or operator details<\/li>\n<li>Number and location of charging stations<\/li>\n<li>Current infrastructure or project status<\/li>\n<\/ul>"},"template_lp_sbs_repeater":[{"template_lp_sbs_repeater_title":"Record EV Charging Station Specifications","template_lp_sbs_repeater_content":"<p>Next, you will want to document the technical specifications of the charging infrastructure to provide a clear record of the equipment installed. Make sure to include details such as:<\/p>\n<ul>\n<li>Charging station type (AC or DC)<\/li>\n<li>Charging power capacity (kW)<\/li>\n<li>Number and type of charging connectors<\/li>\n<li>Electrical supply and grid connection details<\/li>\n<li>Installation and commissioning status<\/li>\n<\/ul>"},{"template_lp_sbs_repeater_title":"Monitor Charging Station Performance","template_lp_sbs_repeater_content":"<p>Monitoring the performance of EV charging stations helps determine whether the infrastructure is operating as intended. Here are some examples of key performance metrics that should be recorded:<\/p>\n<ul>\n<li>Total charging sessions completed<\/li>\n<li>Energy delivered (kWh)<\/li>\n<li>Average charging session duration<\/li>\n<li>Charger uptime and downtime<\/li>\n<li>Charging station usage rate<\/li>\n<\/ul>"},{"template_lp_sbs_repeater_title":"Identify Infrastructure Issues and Maintenance Requirements","template_lp_sbs_repeater_content":"<p>It is important that any equipment faults or operational issues are documented so the appropriate corrective actions can be implemented. Common issues that you should look out for include:<\/p>\n<ul>\n<li>Charging equipment or connector faults<\/li>\n<li>Power supply or network connectivity issues<\/li>\n<li>Charging station downtime<\/li>\n<li>Damaged equipment or safety concerns<\/li>\n<li>Outstanding maintenance or repair requirements<\/li>\n<\/ul>"}],"template_lp_sbs_final_group":{"template_lp_sbs_final_header":"Complete Review, Recommendations, and Sign-Off","template_lp_sbs_final_content":"<p>Complete your EV Charging Infrastructure Report with a section that allows users to review the findings and confirm that the information recorded has been acknowledged. Here are some examples of fields you can include:<\/p>\n<ul>\n<li>Summary of charging infrastructure performance<\/li>\n<li>Recommendations for maintenance or improvements<\/li>\n<li>Names and roles of reviewers and approvers<\/li>\n<li>Date of review and approval<\/li>\n<li>Project manager or responsible personnel sign-off<\/li>\n<\/ul>"},"template_lp_faq_1":"What is an EV Charging Infrastructure Report used for?","template_lp_faq_1_answer":"<p>An EV charging infrastructure report is used to document the development, installation, and performance of electric vehicle charging facilities. This is important for infrastructure projects where teams need to track charging capacity, installation progress, equipment performance, project costs, and maintenance requirements.<\/p>","template_lp_faq_2":"Are there any regulations or legislation on how to format an EV Charging Infrastructure Report?","template_lp_faq_2_answer":"<p>There is no single required format for an EV Charging Infrastructure Report across all regions. However, local electrical codes, infrastructure permits, and project requirements may specify what information needs to be recorded. International standards such as IEC 61851 and IEC 60364-7-722 also provide technical requirements for EV charging equipment and electrical installations, which may need to be reflected in the report.<\/p>","template_lp_faq_3":"What should be included in an EV Charging Infrastructure Report?","template_lp_faq_3_answer":"<p>An EV Charging Infrastructure Report should include the project location, number of charging stations, charger types, power ratings (kW), installation progress, electrical capacity, equipment costs, inspection results, and maintenance records. For operating stations, an EV charger report should also track energy delivered (kWh), charging sessions, equipment uptime, and fault records.<\/p>","template_lp_faq_4":"How is AI helping teams create EV Charging Infrastructure Reports?","template_lp_faq_4_answer":"<p>AI can help teams create EV Charging Infrastructure Reports by turning installation records, charging data, inspection findings, and cost information into clear report drafts. It can also help identify equipment faults, track charger usage, flag missing information, and prepare performance summaries for project teams.<\/p>","template_lp_process_name":"Process name title","template_lp_process_steps_content":"<p>A well-designed EV Charging Inspection and Compliance process helps site teams document equipment condition, installation checks, test results, defects, and compliance requirements, while keeping records structured for easy review, follow-up, and sharing.<\/p>","estimated_time":"30 minutes","template_lp_difficulty":"medium","template_lp_lower_sbs_step_1_group":{"template_lp_sbs_lower_step_1_header":"Start your EV Infrastructure Compliance Report with Project Information","template_lp_sbs_lower_step_1_content":"<p>It is important to begin your EV Infrastructure Compliance Report with key project, site, inspection date, contractor, and reference details so the document can be traced to the correct EV charging installation. This section should use simple text and date fields for fields such as:<\/p>\n<ul>\n<li>Date selector field for Date of Inspection<\/li>\n<li>Text fields for Project Name and Site Address<\/li>\n<li>Text field for Installer\/Contractor<\/li>\n<li>Text field for Report Prepared By<\/li>\n<li>Text field or Automatic Form Counter for Installation Reference Number<\/li>\n<\/ul>"},"template_lp_lower_sbs_repeater":[{"template_lp_lower_sbs_repeater_title":"Create a Section for Installation Overview","template_lp_lower_sbs_repeater_content":"<p>Next, create a section where users can record the type of EV charging infrastructure installed, its equipment details, and installation characteristics. For simplicity, we recommend using text, dropdown, and Yes\/No selector fields for fields such as:<\/p>\n<ul>\n<li>Date selector field for Date of Commissioning<\/li>\n<li>Dropdown field for Type of EV Charger Installed<\/li>\n<li>Number field for Quantity of Charging Units<\/li>\n<li>Text fields for Manufacturer\/Model and Serial Number<\/li>\n<li>Dropdown field for Installation Type<\/li>\n<li>Yes\/No selector field for Completed OCPP Compliance?<\/li>\n<\/ul>"},{"template_lp_lower_sbs_repeater_title":"Create a Table for Electrical Safety Compliance","template_lp_lower_sbs_repeater_content":"<p>Users will next need to assess the electrical safety requirements of the EV charging installation, including circuit protection, cable sizing, earthing, and isolation arrangements. We highly recommend using a table for this section so each requirement can be assessed alongside its compliance status, supporting notes, and photographic evidence.<\/p>\n<ul>\n<li>First column for Requirement<\/li>\n<li>Second column for Compliant?, with a dropdown field for Compliant, Non-compliant, and N\/A<\/li>\n<li>Third column for Notes<\/li>\n<li>Fourth column for Photo, with photo upload or capture fields<\/li>\n<li>Pre-filled rows for Circuit Design, RCD Protection, Overcurrent Protection, and Earthing System Requirements<\/li>\n<li>Additional pre-filled rows for Cable Sizing and Installation, Isolation and Emergency Disconnection, Earthing and Bonding, and Surge Protection Devices<\/li>\n<\/ul>"},{"template_lp_lower_sbs_repeater_title":"Create a Table for Smart Charging Compliance","template_lp_lower_sbs_repeater_content":"<p>After recording electrical safety compliance, add a section where users can assess the smart charging functions and communication capabilities of the installed EV charging equipment. We highly recommend using a table for this section with the same column formatting as the electrical safety checklist, including pre-filled requirements such as:<\/p>\n<ul>\n<li>Smart Functionality, including Demand Response and Delayed Charging<\/li>\n<li>Default Off-Peak Charging Settings<\/li>\n<li>Remote Software Update Capability<\/li>\n<li>Secure Communication Protocols<\/li>\n<li>User Access and Data Protection Requirements<\/li>\n<\/ul>"},{"template_lp_lower_sbs_repeater_title":"Create a Table for Building and Accessibility Compliance","template_lp_lower_sbs_repeater_content":"<p>Next, create a section where users can assess whether the EV charging installation meets applicable building, electrical, and accessibility requirements. We highly recommend using a table for this section with the same compliance status, notes, and photo columns, with pre-filled requirements such as:<\/p>\n<ul>\n<li>Installation Work Meets Applicable Electrical Safety Requirements<\/li>\n<li>Cable Routes and Protective Enclosures Meet Applicable Building Requirements<\/li>\n<li>Accessibility of Charging Points for All Users<\/li>\n<li>Parking Bay Markings and Signage Provided<\/li>\n<\/ul>"},{"template_lp_lower_sbs_repeater_title":"Create a Table for Fire and Safety Compliance","template_lp_lower_sbs_repeater_content":"<p>Next, create a section where users can assess fire protection, emergency isolation, and ventilation arrangements for the installed charging equipment. We highly recommend using a table for this section so each requirement can be assessed alongside its compliance status and supporting evidence.<\/p>\n<ul>\n<li>First column for Requirement<\/li>\n<li>Second column for Compliant?, with a dropdown field for Compliant, Non-compliant, and N\/A<\/li>\n<li>Third column for Notes<\/li>\n<li>Fourth column for Photo, with photo upload or capture fields<\/li>\n<li>Pre-filled rows for Fire Separation Requirements, Fire Detection and Suppression Measures, Emergency Shutdown and Isolation Labels, and Adequate Ventilation for Battery and Power Units<\/li>\n<\/ul>"}],"template_lp_lower_sbs_final_group":{"template_lp_lower_sbs_final_title":"End your EV Infrastructure Compliance Report with a Declaration of Conformity","template_lp_lower_sbs_final_content":"<p>Finally, complete the EV Infrastructure Compliance Report with a declaration statement confirming whether the installation has been assessed against applicable electrical safety, EV charging, building, and other relevant requirements. If your app or software allows, use a pre-filled declaration statement and automatic e-signature fields to keep the sign-off process digital.<\/p>\n<ul>\n<li>Pre-filled text field for Declaration of Conformity Statement<\/li>\n<li>Yes\/No selector field for Declaration of Conformity<\/li>\n<li>Conditional multi-line text field for Outstanding Non-compliances or Exceptions<\/li>\n<li>E-signature field for Signature<\/li>\n<li>Automatic date and time stamp field for the sign-off<\/li>\n<\/ul>"},"template_lp_author_select":[{"template_lp_content_author_id_select":"50007"}],"template_lp_published":{"date":"16 November 2026","version":"25-11-v2","author":"Ron","description":"Initial publication, including form overview, FAQ, how-to-guide, and Dashpivot template preview"},"template_lp_revisions":null,"template_lp_type_of_form":"report","template_lp_type_of_form_content":"<p>This report was generated using Dashpivot, where you and your team can create smart documents that allow photos and video attachments, conditions, and more that are tailored to the needs of all your work tasks.<\/p>","template_lp_script_template_name":"ev-charging-infrastructure-report","template_lp_script_template_id":"6911b39d373240f908f198b5","template_lp_relevant_app_button":"https:\/\/sitemate.com\/quality\/quality-reporting-app\/","template_lp_relevant_app_photo_1":"https:\/\/sitemate.com\/wp-content\/uploads\/2023\/03\/Quality-reporting-app-mobile-1.svg","template_lp_difficulty_selector":"50383","template_lp_breadcrumb":"<a href=\"\/templates\/\">Templates<\/a><span class=\"sep\">\/<\/span><a href=\"\/templates\/field-reporting\/\">Field Reporting<\/a><span class=\"sep\">\/<\/span><a href=\"\/templates\/field-reporting\/forms\/\">Forms<\/a><span class=\"sep\">\/<\/span><span aria-current=\"page\">EV Charging Infrastructure Report<\/span>","template_lp_breadcrumb_schema":"{\"@context\":\"https:\/\/schema.org\",\"@type\":\"BreadcrumbList\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Templates\",\"item\":\"https:\/\/sitemate.com\/templates\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Field Reporting\",\"item\":\"https:\/\/sitemate.com\/templates\/field-reporting\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Forms\",\"item\":\"https:\/\/sitemate.com\/templates\/field-reporting\/forms\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"EV Charging Infrastructure Report\",\"item\":\"https:\/\/sitemate.com\/templates\/field-reporting\/forms\/ev-charging-infrastructure-report-template\/\"}]}","template_lp_related_html":"","template_lp_v3_intro":"<p>Reporting on EV charging infrastructure for your construction project, facility, or development? Looking for an EV charging infrastructure report sample to help guide your own reporting process?<\/p>\n<p>This EV Charging Infrastructure Report is an easy-to-use form that your team can use to record and assess electric vehicle charging infrastructure across project sites, buildings, and facilities. Record important details such as the site location, charger type, charging capacity, power supply, installation status, equipment condition, testing results, maintenance activities, and identified issues, then attach supporting photos, files, and sign-offs - all in one free form. Plus, you can even export your completed reports to PDF or CSV for easy sharing with engineers, contractors, facility managers, and other stakeholders.<\/p>","template_lp_v3_demo":"https:\/\/dashpivot.com\/embed\/library-apps\/6911b39d373240f908f198b5","template_lp_v3_body":"<div class=\"custom-grid tlpv3-cards\"><div class=\"tlpv3-card custom-col-4\" data-card=\"what-is\"><h3 class=\"sunflower\">What is a EV Charging Infrastructure Report?<\/h3><div class=\"tlpv3-card-body\"><div class=\"checklist-dot\"><p>An EV Charging Infrastructure Report is a document used by engineers, project managers, electrical contractors, and facility managers to record and assess the installation, condition, and performance of electric vehicle charging systems. This report usually includes details on charging station locations, charger types, power capacity, electrical connections, equipment condition, testing results, maintenance records, and identified issues.<\/p>\n<p>Due to the growing demand for electric vehicles and reliable charging facilities, proper infrastructure reporting is important for identifying equipment faults, electrical safety risks, capacity limitations, and maintenance requirements. This makes EV Charging Infrastructure Reports highly relevant in construction, infrastructure, property development, transport, utilities, and commercial facilities where EV charging stations are installed, operated, or maintained.<\/p><\/div><\/div><button type=\"button\" class=\"learn-more-btn tlpv3-card-toggle\" aria-haspopup=\"dialog\">Expand<\/button><\/div><div class=\"tlpv3-card custom-col-4\" data-card=\"standards\"><h3 class=\"sunflower\">Applicable Standards and Policies for EV Charging Infrastructure Report<\/h3><div class=\"tlpv3-card-body\"><div class=\"checklist-dot\"><p>There are generally no explicit universal formatting requirements for an EV Charging Infrastructure Report. However, most electrical safety and infrastructure regulations require businesses to document charging equipment, installation safety, electrical capacity, and operational performance. An EV Charging Infrastructure Report is a good document to support compliance with these requirements. Here are examples of common standards and regulations referenced around the world:<\/p>\n<ul>\n<li>IEC 61851-1:2017 covers general safety requirements for EV charging equipment<\/li>\n<li>IEC 60364-7-722:2018 covers electrical installations supplying electric vehicles<\/li>\n<li>NFPA 70 National Electrical Code covers EV charging electrical installations in the USA<\/li>\n<li>EU Regulation 2023\/1804 covers public EV charging infrastructure and related data requirements in Europe<\/li>\n<li>Local electrical and building codes commonly require safe installation, testing, and inspection of EV chargers<\/li>\n<\/ul><\/div><\/div><button type=\"button\" class=\"learn-more-btn tlpv3-card-toggle\" aria-haspopup=\"dialog\">Expand<\/button><\/div><div class=\"tlpv3-card custom-col-4\" data-card=\"who-uses\"><h3 class=\"sunflower\">Staff Members and Parties That Use the EV Charging Infrastructure Report<\/h3><div class=\"tlpv3-card-body\"><div class=\"checklist-dot\"><p>An EV Charging Infrastructure Report is primarily used by businesses and project teams that manage the planning, installation, inspection, maintenance, and performance of electric vehicle charging facilities. Here are examples of common parties that use an EV Charging Infrastructure Report:<\/p>\n<ul>\n<li>Project managers and site engineers<\/li>\n<li>Electrical engineers and EV charging installers<\/li>\n<li>Facility managers and property owners<\/li>\n<li>EV charging network operators<\/li>\n<li>Clients and infrastructure investors<\/li>\n<\/ul><\/div><\/div><button type=\"button\" class=\"learn-more-btn tlpv3-card-toggle\" aria-haspopup=\"dialog\">Expand<\/button><\/div><div class=\"tlpv3-card custom-col-4\" data-card=\"risks\"><h3 class=\"sunflower\">Business Risks Reduced by the EV Charging Infrastructure Report<\/h3><div class=\"tlpv3-card-body\"><div class=\"checklist-dot\"><p>Using an EV Charging Infrastructure Report helps businesses identify issues such as insufficient electrical capacity, faulty charging equipment, poor installation practices, and unexpected maintenance requirements before they develop into more serious problems. Without proper infrastructure assessments and documentation, businesses may be exposed to risks such as:<\/p>\n<ul>\n<li>Electrical faults, fire hazards, and charging equipment failures<\/li>\n<li>Non-compliance with electrical safety and installation requirements<\/li>\n<li>Unexpected installation costs and infrastructure upgrades<\/li>\n<li>Charger downtime and poor charging service availability<\/li>\n<li>Project delays caused by equipment failures, inspections, or grid connection issues<\/li>\n<\/ul><\/div><\/div><button type=\"button\" class=\"learn-more-btn tlpv3-card-toggle\" aria-haspopup=\"dialog\">Expand<\/button><\/div><div class=\"tlpv3-card custom-col-4\" data-card=\"opportunities\"><h3 class=\"sunflower\">Business Opportunities Created by the EV Charging Infrastructure Report<\/h3><div class=\"tlpv3-card-body\"><div class=\"checklist-dot\"><p>A well-prepared EV Charging Infrastructure Report helps businesses improve infrastructure planning, charging performance, and investment decisions across different sites and facilities. Here are some ways an EV Charging Infrastructure Report can help businesses:<\/p>\n<ul>\n<li>Identify opportunities to expand EV charging capacity based on demand<\/li>\n<li>Improve charger reliability and maintenance planning<\/li>\n<li>Support better investment decisions through charging usage and performance data<\/li>\n<li>Build client and investor confidence through documented infrastructure performance<\/li>\n<\/ul><\/div><\/div><button type=\"button\" class=\"learn-more-btn tlpv3-card-toggle\" aria-haspopup=\"dialog\">Expand<\/button><\/div><div class=\"tlpv3-card custom-col-4\" data-card=\"contents\"><h3 class=\"sunflower\">What Should be Included in an EV Charging Infrastructure Report?<\/h3><div class=\"tlpv3-card-body\"><div class=\"checklist-dot\"><p>There are no single global requirements that cover the exact format of an EV Charging Infrastructure Report. Rather, reporting requirements can vary depending on the region, project type, charging network, and applicable electrical and infrastructure standards. However, there are some core elements that are typically included that you should know about:<\/p>\n<ul>\n<li>Site details such as project location, reporting period, charging station operator, and responsible persons<\/li>\n<li>Charging infrastructure details including charger types, number of charging points, power ratings (kW), and electrical supply capacity<\/li>\n<li>Installation and commissioning status, electrical inspection results, equipment testing, and outstanding works<\/li>\n<li>Charging performance metrics such as energy delivered (kWh), charging sessions, equipment uptime, and station usage<\/li>\n<li>Equipment faults, maintenance activities, safety issues, corrective actions, and future infrastructure requirements<\/li>\n<\/ul><\/div><\/div><button type=\"button\" class=\"learn-more-btn tlpv3-card-toggle\" aria-haspopup=\"dialog\">Expand<\/button><\/div><div class=\"tlpv3-card custom-col-4\" data-card=\"build-guide\"><h3 class=\"sunflower\">How to Create an EV Charging Infrastructure Report<\/h3><div class=\"tlpv3-card-body\"><div class=\"checklist-dot\"><p>Creating an EV Charging Infrastructure Report will need careful planning and knowledge of different charging applications and even on the EVs themselves. In this section, we discuss important steps so you can create your own report from scratch.<\/p><\/div><h4 class=\"sunflower\">Before starting your EV Charging Infrastructure Report form, the following pre-requisites should be ready.<\/h4><div class=\"checklist-tick\"><ul>\n<li>Project or site details are required.<\/li>\n<li>Charging station locations and equipment types must be listed.<\/li>\n<li>Charger capacity, power ratings, and connector types must be recorded.<\/li>\n<li>Electrical supply and grid connection details must be available.<\/li>\n<li>Installation, inspection, and testing records must be included.<\/li>\n<li>Charger usage, availability, and performance data must be recorded.<\/li>\n<li>Safety, maintenance, and compliance details must be documented.<\/li>\n<\/ul><\/div><ol class=\"tlpv3-steps\"><li><p class=\"eyebrow-sm\"><\/p><h4 class=\"sunflower\">Start with Project and Infrastructure Information<\/h4><div class=\"checklist-dot\"><p>Recording general project information at the beginning of your EV Charging Infrastructure Report helps establish context for the charging infrastructure being assessed. Here are some examples of core information that you should include:<\/p>\n<ul>\n<li>Project name and site location<\/li>\n<li>Reporting date and period<\/li>\n<li>Charging station owner or operator details<\/li>\n<li>Number and location of charging stations<\/li>\n<li>Current infrastructure or project status<\/li>\n<\/ul><\/div><\/li><li><p class=\"eyebrow-sm\"><\/p><h4 class=\"sunflower\">Record EV Charging Station Specifications<\/h4><div class=\"checklist-dot\"><p>Next, you will want to document the technical specifications of the charging infrastructure to provide a clear record of the equipment installed. Make sure to include details such as:<\/p>\n<ul>\n<li>Charging station type (AC or DC)<\/li>\n<li>Charging power capacity (kW)<\/li>\n<li>Number and type of charging connectors<\/li>\n<li>Electrical supply and grid connection details<\/li>\n<li>Installation and commissioning status<\/li>\n<\/ul><\/div><\/li><li><p class=\"eyebrow-sm\"><\/p><h4 class=\"sunflower\">Monitor Charging Station Performance<\/h4><div class=\"checklist-dot\"><p>Monitoring the performance of EV charging stations helps determine whether the infrastructure is operating as intended. Here are some examples of key performance metrics that should be recorded:<\/p>\n<ul>\n<li>Total charging sessions completed<\/li>\n<li>Energy delivered (kWh)<\/li>\n<li>Average charging session duration<\/li>\n<li>Charger uptime and downtime<\/li>\n<li>Charging station usage rate<\/li>\n<\/ul><\/div><\/li><li><p class=\"eyebrow-sm\"><\/p><h4 class=\"sunflower\">Identify Infrastructure Issues and Maintenance Requirements<\/h4><div class=\"checklist-dot\"><p>It is important that any equipment faults or operational issues are documented so the appropriate corrective actions can be implemented. Common issues that you should look out for include:<\/p>\n<ul>\n<li>Charging equipment or connector faults<\/li>\n<li>Power supply or network connectivity issues<\/li>\n<li>Charging station downtime<\/li>\n<li>Damaged equipment or safety concerns<\/li>\n<li>Outstanding maintenance or repair requirements<\/li>\n<\/ul><\/div><\/li><li><p class=\"eyebrow-sm\"><\/p><h4 class=\"sunflower\">Complete Review, Recommendations, and Sign-Off<\/h4><div class=\"checklist-dot\"><p>Complete your EV Charging Infrastructure Report with a section that allows users to review the findings and confirm that the information recorded has been acknowledged. Here are some examples of fields you can include:<\/p>\n<ul>\n<li>Summary of charging infrastructure performance<\/li>\n<li>Recommendations for maintenance or improvements<\/li>\n<li>Names and roles of reviewers and approvers<\/li>\n<li>Date of review and approval<\/li>\n<li>Project manager or responsible personnel sign-off<\/li>\n<\/ul><\/div><\/li><\/ol><\/div><button type=\"button\" class=\"learn-more-btn tlpv3-card-toggle\" aria-haspopup=\"dialog\">Expand<\/button><\/div><div class=\"tlpv3-card custom-col-4\" data-card=\"extra\"><h3 class=\"sunflower\">What Performance Metrics Should be Tracked for EV Charging Stations?<\/h3><div class=\"tlpv3-card-body\"><div class=\"checklist-dot\"><p>EV charging stations should be monitored regularly to assess their reliability, usage, energy consumption, and overall operating performance. This is especially important for public charging networks, commercial facilities, and transport infrastructure projects where equipment faults, power supply issues, and high demand can affect charging availability. Common performance metrics include charger uptime and availability (%), energy delivered (kWh), number of charging sessions, average charging duration, and charger usage rates. Additionally, operators should track charging success rates, equipment faults, maintenance response times, and peak power demand (kW) to assess station performance and identify areas that require improvement.<\/p>\n<p>Essentially, an EV Charging Infrastructure Report helps project management teams track installation progress, assess charger performance, and identify equipment or electrical issues that require attention. Additionally, it provides clear documentation of infrastructure conditions, testing results, and maintenance activities, supporting future upgrades, asset management, and compliance with relevant electrical safety and project requirements.<\/p><\/div><\/div><button type=\"button\" class=\"learn-more-btn tlpv3-card-toggle\" aria-haspopup=\"dialog\">Expand<\/button><\/div><div class=\"tlpv3-card custom-col-4\" data-card=\"app-guide\"><h3 class=\"sunflower\">How to Create Your EV Charging Infrastructure Report in an App or Software System<\/h3><div class=\"tlpv3-card-body\"><div class=\"checklist-dot\"><p>A well-designed EV Charging Inspection and Compliance process helps site teams document equipment condition, installation checks, test results, defects, and compliance requirements, while keeping records structured for easy review, follow-up, and sharing.<\/p><\/div><ol class=\"tlpv3-steps\"><li><p class=\"eyebrow-sm\"><\/p><h4 class=\"sunflower\">Start your EV Infrastructure Compliance Report with Project Information<\/h4><div class=\"checklist-tick\"><p>It is important to begin your EV Infrastructure Compliance Report with key project, site, inspection date, contractor, and reference details so the document can be traced to the correct EV charging installation. This section should use simple text and date fields for fields such as:<\/p>\n<ul>\n<li>Date selector field for Date of Inspection<\/li>\n<li>Text fields for Project Name and Site Address<\/li>\n<li>Text field for Installer\/Contractor<\/li>\n<li>Text field for Report Prepared By<\/li>\n<li>Text field or Automatic Form Counter for Installation Reference Number<\/li>\n<\/ul><\/div><\/li><li><p class=\"eyebrow-sm\"><\/p><h4 class=\"sunflower\">Create a Section for Installation Overview<\/h4><div class=\"checklist-tick\"><p>Next, create a section where users can record the type of EV charging infrastructure installed, its equipment details, and installation characteristics. For simplicity, we recommend using text, dropdown, and Yes\/No selector fields for fields such as:<\/p>\n<ul>\n<li>Date selector field for Date of Commissioning<\/li>\n<li>Dropdown field for Type of EV Charger Installed<\/li>\n<li>Number field for Quantity of Charging Units<\/li>\n<li>Text fields for Manufacturer\/Model and Serial Number<\/li>\n<li>Dropdown field for Installation Type<\/li>\n<li>Yes\/No selector field for Completed OCPP Compliance?<\/li>\n<\/ul><\/div><\/li><li><p class=\"eyebrow-sm\"><\/p><h4 class=\"sunflower\">Create a Table for Electrical Safety Compliance<\/h4><div class=\"checklist-tick\"><p>Users will next need to assess the electrical safety requirements of the EV charging installation, including circuit protection, cable sizing, earthing, and isolation arrangements. We highly recommend using a table for this section so each requirement can be assessed alongside its compliance status, supporting notes, and photographic evidence.<\/p>\n<ul>\n<li>First column for Requirement<\/li>\n<li>Second column for Compliant?, with a dropdown field for Compliant, Non-compliant, and N\/A<\/li>\n<li>Third column for Notes<\/li>\n<li>Fourth column for Photo, with photo upload or capture fields<\/li>\n<li>Pre-filled rows for Circuit Design, RCD Protection, Overcurrent Protection, and Earthing System Requirements<\/li>\n<li>Additional pre-filled rows for Cable Sizing and Installation, Isolation and Emergency Disconnection, Earthing and Bonding, and Surge Protection Devices<\/li>\n<\/ul><\/div><\/li><li><p class=\"eyebrow-sm\"><\/p><h4 class=\"sunflower\">Create a Table for Smart Charging Compliance<\/h4><div class=\"checklist-tick\"><p>After recording electrical safety compliance, add a section where users can assess the smart charging functions and communication capabilities of the installed EV charging equipment. We highly recommend using a table for this section with the same column formatting as the electrical safety checklist, including pre-filled requirements such as:<\/p>\n<ul>\n<li>Smart Functionality, including Demand Response and Delayed Charging<\/li>\n<li>Default Off-Peak Charging Settings<\/li>\n<li>Remote Software Update Capability<\/li>\n<li>Secure Communication Protocols<\/li>\n<li>User Access and Data Protection Requirements<\/li>\n<\/ul><\/div><\/li><li><p class=\"eyebrow-sm\"><\/p><h4 class=\"sunflower\">Create a Table for Building and Accessibility Compliance<\/h4><div class=\"checklist-tick\"><p>Next, create a section where users can assess whether the EV charging installation meets applicable building, electrical, and accessibility requirements. We highly recommend using a table for this section with the same compliance status, notes, and photo columns, with pre-filled requirements such as:<\/p>\n<ul>\n<li>Installation Work Meets Applicable Electrical Safety Requirements<\/li>\n<li>Cable Routes and Protective Enclosures Meet Applicable Building Requirements<\/li>\n<li>Accessibility of Charging Points for All Users<\/li>\n<li>Parking Bay Markings and Signage Provided<\/li>\n<\/ul><\/div><\/li><li><p class=\"eyebrow-sm\"><\/p><h4 class=\"sunflower\">Create a Table for Fire and Safety Compliance<\/h4><div class=\"checklist-tick\"><p>Next, create a section where users can assess fire protection, emergency isolation, and ventilation arrangements for the installed charging equipment. We highly recommend using a table for this section so each requirement can be assessed alongside its compliance status and supporting evidence.<\/p>\n<ul>\n<li>First column for Requirement<\/li>\n<li>Second column for Compliant?, with a dropdown field for Compliant, Non-compliant, and N\/A<\/li>\n<li>Third column for Notes<\/li>\n<li>Fourth column for Photo, with photo upload or capture fields<\/li>\n<li>Pre-filled rows for Fire Separation Requirements, Fire Detection and Suppression Measures, Emergency Shutdown and Isolation Labels, and Adequate Ventilation for Battery and Power Units<\/li>\n<\/ul><\/div><\/li><li><p class=\"eyebrow-sm\"><\/p><h4 class=\"sunflower\">End your EV Infrastructure Compliance Report with a Declaration of Conformity<\/h4><div class=\"checklist-tick\"><p>Finally, complete the EV Infrastructure Compliance Report with a declaration statement confirming whether the installation has been assessed against applicable electrical safety, EV charging, building, and other relevant requirements. If your app or software allows, use a pre-filled declaration statement and automatic e-signature fields to keep the sign-off process digital.<\/p>\n<ul>\n<li>Pre-filled text field for Declaration of Conformity Statement<\/li>\n<li>Yes\/No selector field for Declaration of Conformity<\/li>\n<li>Conditional multi-line text field for Outstanding Non-compliances or Exceptions<\/li>\n<li>E-signature field for Signature<\/li>\n<li>Automatic date and time stamp field for the sign-off<\/li>\n<\/ul><\/div><\/li><\/ol><\/div><button type=\"button\" class=\"learn-more-btn tlpv3-card-toggle\" aria-haspopup=\"dialog\">Expand<\/button><\/div><\/div>","template_lp_v3_faq":"<details class=\"tlpv3-acc\" data-acc=\"faq-1\"><summary><h3>What is an EV Charging Infrastructure Report used for?<\/h3><span class=\"tlpv3-acc-icon\" aria-hidden=\"true\"><\/span><\/summary><div class=\"tlpv3-acc-panel\"><div class=\"checklist-dot\"><p>An EV charging infrastructure report is used to document the development, installation, and performance of electric vehicle charging facilities. This is important for infrastructure projects where teams need to track charging capacity, installation progress, equipment performance, project costs, and maintenance requirements.<\/p><\/div><\/div><\/details><details class=\"tlpv3-acc\" data-acc=\"faq-2\"><summary><h3>Are there any regulations or legislation on how to format an EV Charging Infrastructure Report?<\/h3><span class=\"tlpv3-acc-icon\" aria-hidden=\"true\"><\/span><\/summary><div class=\"tlpv3-acc-panel\"><div class=\"checklist-dot\"><p>There is no single required format for an EV Charging Infrastructure Report across all regions. However, local electrical codes, infrastructure permits, and project requirements may specify what information needs to be recorded. International standards such as IEC 61851 and IEC 60364-7-722 also provide technical requirements for EV charging equipment and electrical installations, which may need to be reflected in the report.<\/p><\/div><\/div><\/details><details class=\"tlpv3-acc\" data-acc=\"faq-3\"><summary><h3>What should be included in an EV Charging Infrastructure Report?<\/h3><span class=\"tlpv3-acc-icon\" aria-hidden=\"true\"><\/span><\/summary><div class=\"tlpv3-acc-panel\"><div class=\"checklist-dot\"><p>An EV Charging Infrastructure Report should include the project location, number of charging stations, charger types, power ratings (kW), installation progress, electrical capacity, equipment costs, inspection results, and maintenance records. For operating stations, an EV charger report should also track energy delivered (kWh), charging sessions, equipment uptime, and fault records.<\/p><\/div><\/div><\/details><details class=\"tlpv3-acc\" data-acc=\"faq-4\"><summary><h3>How is AI helping teams create EV Charging Infrastructure Reports?<\/h3><span class=\"tlpv3-acc-icon\" aria-hidden=\"true\"><\/span><\/summary><div class=\"tlpv3-acc-panel\"><div class=\"checklist-dot\"><p>AI can help teams create EV Charging Infrastructure Reports by turning installation records, charging data, inspection findings, and cost information into clear report drafts. It can also help identify equipment faults, track charger usage, flag missing information, and prepare performance summaries for project teams.<\/p><\/div><\/div><\/details>","template_lp_v3_storm_prompt":"Can I get an EV Charging Infrastructure Report that I can deploy onsite today?","template_lp_v3_author":"<h2 class=\"sunflower\">About the Author<\/h2><div class=\"sm-author\">\n  <div class=\"sm-blog-author\">\n    <img src=\"\/wp-content\/uploads\/2026\/01\/ron.png\" alt=\"Ron Gadugdug\" width=\"96\" height=\"96\" loading=\"lazy\">\n    <div class=\"sm-blog-author-meta\">\n      <h3>Ron Gadugdug<\/h3>\n      <p>Content Engineer <br> <a href=\"https:\/\/www.linkedin.com\/in\/ron-gadugdug-723682182\/\" target=\"_blank\" rel=\"noopener\" style=\"display:inline-flex;align-items:center;gap:6px;vertical-align:middle\"><img src=\"\/wp-content\/uploads\/2025\/11\/linkedin-icon.svg\" alt=\"\" width=\"16\" height=\"16\">LinkedIn<\/a><\/p>\n    <\/div>\n  <\/div>\n\n  <h3>Education<\/h3>\n  <p>Cebu Institute of Technology - University - Civil Engineering<\/p>\n\n  <h3>Bio<\/h3>\n  <p>Ron is a Civil Engineer with 6 years of experience in the construction industry, primarily focused on quantity surveying, cost estimation, project management, quality control, contract administration, and property &amp; engineering insurance. At Sitemate, he writes about practical applications of evolving technologies and digital solutions that support construction professionals in improving efficiency, compliance, and project delivery across the built world.<\/p>\n\n  <div class=\"sm-blog-bento\">\n    <h3>Past Projects<\/h3>\n    <p class=\"sm-blog-project\"><strong>Quantity Surveying &amp; Cost Engineering<\/strong>Performed quantity take-offs of several high-rise and horizontal structures using sheets and applications like Revit and Bluebeam Revu, and spearheaded trials with Building Information Modeling (BIM) software.<\/p>\n    <p class=\"sm-blog-project\"><strong>Project Management &amp; Consultancy<\/strong>Coordinated with project management teams during the construction of local projects such as a 4-tower hotel &amp; resort, a 22 storey condominium project, and a school dormitory project.<\/p>\n    <p class=\"sm-blog-project\"><strong>Contract Administration<\/strong>Assisted during contract biddings and negotiations with general contractors and sub-contractors, and oversaw progress reporting, billings, and payment.<\/p>\n    <p class=\"sm-blog-project\"><strong>Property &amp; Engineering Insurance<\/strong>Dedicated non-life claims handler, overseeing property and contractor all-risk insurance claims, risk management, and bonds.<\/p>\n  <\/div>\n<\/div>","template_lp_v3_gallery":"<img class=\"tlpv3-lb-slide\" src=\"https:\/\/sitemate.com\/wp-content\/uploads\/2025\/11\/EV-Infrastructure-Compliance-Report-page-001-scaled.jpg\" alt=\"EV Charging Infrastructure Report template, page 1 of 3\" loading=\"lazy\"><img class=\"tlpv3-lb-slide\" src=\"https:\/\/sitemate.com\/wp-content\/uploads\/2025\/11\/EV-Infrastructure-Compliance-Report-page-002-scaled.jpg\" alt=\"EV Charging Infrastructure Report template, page 2 of 3\" loading=\"lazy\"><img class=\"tlpv3-lb-slide\" src=\"https:\/\/sitemate.com\/wp-content\/uploads\/2025\/11\/EV-Infrastructure-Compliance-Report-page-003-scaled.jpg\" alt=\"EV Charging Infrastructure Report template, page 3 of 3\" loading=\"lazy\">","template_lp_v3_name":"EV Charging Infrastructure Report","template_lp_v3_function":"Field Reporting","template_lp_v3_script_name":"ev-charging-infrastructure-report","template_lp_v3_script_id":"6911b39d373240f908f198b5","template_lp_v3_cover":"https:\/\/sitemate.com\/wp-content\/uploads\/2025\/11\/EV-Infrastructure-Compliance-Report-page-001-scaled.jpg","template_lp_v3_app_photo":"https:\/\/sitemate.com\/wp-content\/uploads\/2023\/03\/Quality-reporting-app-mobile-1.svg","template_lp_v3_compare_header":"Compare this EV Charging Infrastructure Report to reports made on other formats","template_lp_v3_compare_content":"<p>Curious how this report works? Check out the example below to see how you can generate your own version, export it as a custom form with your company details, and fill in your information to have a ready-to-use EV Charging Infrastructure Report Form in minutes. No more starting from scratch like you would on Excel or Word based forms.<\/p>","template_lp_v3_dp_copy":"<p>This report was generated using Dashpivot, where you and your team can create smart documents that allow photos and video attachments, conditions, and more that are tailored to the needs of all your work tasks.<\/p>","template_lp_v3_published_date":"16 November 2026","template_lp_v3_published_version":"25-11-v2"},"custom_permalink":"templates\/environmental\/forms\/ev-charging-infrastructure-report-template","_links":{"self":[{"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/posts\/59913","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/users\/18"}],"replies":[{"embeddable":true,"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/comments?post=59913"}],"version-history":[{"count":1,"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/posts\/59913\/revisions"}],"predecessor-version":[{"id":59914,"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/posts\/59913\/revisions\/59914"}],"acf:attachment":[{"embeddable":true,"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/media\/47820"},{"embeddable":true,"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/media\/47819"},{"embeddable":true,"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/media\/47818"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/media\/47818"}],"wp:attachment":[{"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/media?parent=59913"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/categories?post=59913"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/tags?post=59913"},{"taxonomy":"industry","embeddable":true,"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/industry?post=59913"},{"taxonomy":"product","embeddable":true,"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/product?post=59913"},{"taxonomy":"region","embeddable":true,"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/region?post=59913"},{"taxonomy":"system","embeddable":true,"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/system?post=59913"},{"taxonomy":"content_type","embeddable":true,"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/content_type?post=59913"},{"taxonomy":"topic","embeddable":true,"href":"https:\/\/sitemate.com\/de\/wp-json\/wp\/v2\/topic?post=59913"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}