{"id":10200,"date":"2019-03-14T00:37:58","date_gmt":"2019-03-14T00:37:58","guid":{"rendered":"https:\/\/sitemate.com\/?p=10200"},"modified":"2025-02-13T02:01:18","modified_gmt":"2025-02-13T02:01:18","slug":"construction-project-handover-procedure","status":"publish","type":"post","link":"https:\/\/sitemate.com\/nz\/resources\/articles\/construction\/construction-project-handover-procedure\/","title":{"rendered":"Construction &#8211; Construction project handover procedure"},"content":{"rendered":"<h1>Construction project handover procedure<\/h1>\n\t<p>In this article, we cover the construction project handover procedure, how to get it right, and provide resources to better manage your site handovers on-site.<\/p>\n\t\t\t\t<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/sitemate.com\/wp-content\/uploads\/2019\/03\/construction-project-handover-procedure.jpg\" alt=\"construction project handover procedure\" itemprop=\"image\" height=\"267\" width=\"400\" title=\"construction project handover procedure\" onerror=\"this.style.display='none'\"  \/>\n\t<h2>What does a construction project handover procedure involve?<\/h2>\n<p>All phases of a construction project are vital to the success of the project, including the project handover phase.<\/p>\n<p>Sometimes, the project handover can be seen as the finish line, which allows some complacency and relaxation to creep in.<\/p>\n<p>But the project handover phase is really important, and requires everyone to be well and truly on their toes.<\/p>\n<p><b>Having a consistent and reliable construction project handover procedure can drastically lower the risk of handover and ongoing issues.<\/b><\/p>\n<p>A good construction project handover procedure can mean the difference between positive stakeholder relations and messy disputes.<\/p>\n<p>So what does a project handover procedure typically involve?<\/p>\n<p>When a construction project is nearing practical completion, parties begin preparing for the project handover starting with:<\/p>\n<p><strong>Testing and commissioning &#8211;\u00a0<\/strong>Up-to-date testing and commissioning data is really important in any project handover procedure. The asset owner or handover receiver should obtain all necessary construction certificates, as well as inspect and approve the as built documentation, operations and maintenance manuals and required inspections.<\/p>\n<p><strong>Defect management &#8211;<\/strong> The project handover procedure should involve discussion and agreement around the defects reporting procedure, as well as access arrangements (and insurance arrangements) for the contractor to remedy the defects.<\/p>\n<p><strong>Compliance reporting &#8211;\u00a0<\/strong>The design manager (or similar) will review the project, functional design brief and project specs to assess performance and identify any ongoing design risks.<\/p>\n<p><strong>The project handover &#8211;<\/strong> Once the contractor has confirmed that the works defined in the contract is complete, the handover, including handover fundamentals like keys etc. is often performed on site in accordance with a final inspection.<\/p>\n<p>So as you can see, there are a lot of moving pieces involved in a project handover, so how can you best manage your construction project handover procedure?<\/p>\n\t<h2>Getting your construction project handover procedure right<\/h2>\n<p>One of the most powerful tools you can use for ensuring that your project handover procedure is standardised and reliable is to codify the procedure in a <a href=\"https:\/\/sitemate.com\/nz\/templates\/commercial\/forms\/construction-project-handover-checklist\/\" target=\"_blank\" rel=\"noopener\">project handover checklist.<\/a><\/p>\n<blockquote><p>Documenting your procedure like this guarantees that every project is handed over in the same way, and that nothing important gets missed. It also enables your company to continuously improve the process over time, spotting and highlighting issues with the handover process, and then adding new items to the procedural checklist.<\/p><\/blockquote>\n<p>You&#8217;ll see that the example below features many of the sections highlighted in the above project handover procedure.<\/p>\n<p>The document features requisite record keeping information including project names and the person responsible for the handover, as well as sections and items for all of those important handover procedure items including:<\/p>\n<ul>\n<li>The testing and commissioning data<\/li>\n<li>The defect management information<\/li>\n<li>The compliance reporting<\/li>\n<li>Handover logistics<\/li>\n<\/ul>\n<p>In addition, the document covers subitems within these categories, giving the person or a company a bulletproof way to ensure that the project is handed over properly.<\/p>\n  <img decoding=\"async\" id=\"template\" src=\"https:\/\/sitemate.com\/wp-content\/uploads\/2019\/03\/2019-03-13-Example-Template-Project-Project-Handover-Checklist-1-page-001.jpg\" alt=\"Construction project handover procedure\" loading=\"lazy\" \/>\n    Preview the full example\n\t<h2>Use this project handover procedure for yourself for free.<\/h2>\n\t\t\t<a href=\"https:\/\/dashpivot.com\/signup?reference=construction-project-handover-procedure-article&#038;templateId=5c86eb776a7f7c2ddcfadbe4\" target=\"_self\" rel=\"nofollow noopener\">\n\t\t\t\t\t\t\tGet started now\n\t\t\t\t\t<\/a>\n\t<h2>Staying perpetually prepared for your project handover procedure<\/h2>\n<p>The project handover process can be smooth and &#8216;enjoyable&#8217;, or a frantic nightmare.<\/p>\n<blockquote><p>While your construction project handover procedure will have some bearing on this, how you manage and deliver your project during the entire project lifecycle will have an equally powerful bearing on the success of your handover.<\/p><\/blockquote>\n<p>For some companies, the project handover phase is a scramble to get everything together and hand everything over while remaining on time and on budget.<\/p>\n<p>Most companies which require this mad scramble are trying to pull records and information from multiple places and sources. During the project, unstandardised templates and data has been flying around via word docs, spreadsheets and PDFs, and being stored on private hard drives and servers.<\/p>\n<p>In contrast, companies who sail through the process have a single <a href=\"https:\/\/sitemate.com\/nz\/systems-it\/project-management-software\/\" target=\"_blank\" rel=\"noopener\">integrated management system<\/a> where they can instantly search for and find all of their project information.<\/p>\n\t\t\t\t<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/sitemate.com\/wp-content\/uploads\/2019\/03\/Construction-documents-checklist.png\" alt=\"Construction documents checklist\" itemprop=\"image\" height=\"700\" width=\"1400\" title=\"Construction documents checklist\" onerror=\"this.style.display='none'\"  \/>\n\t<p>A system like this (which you can try for free), consolidates all of your project information in once place, and ensures your data is all true and accurate.<\/p>\n<p>All of your defect, testing and commission data is stored securely in a digital format, which can be sent via email or exported as PDF reports to send during the project handover process.<\/p>\n<p>This makes handover communication quick and easy, and reduces the headaches associated with chasing and finding information which has been fragmented throughout the project.<\/p>\n<hr \/>\n<p>A great construction project handover procedure is a neccesary but insufficient requirement of delivery consistently smooth project handovers.<\/p>\n<p>Managing your information and project delivery in aan efficient and organised manner from day one is the best way to ensure pain-free project handovers.<\/p>\n\t<h3>Use and edit template for free<\/h3>\n\t\t\t<a href=\"https:\/\/dashpivot.com\/signup?reference=site-visit-report-format-article&#038;templateId=64575aaab7421ddc192f2bc2\" target=\"_self\" rel=\"nofollow noopener\">\n\t\t\t\t\t\t\tUse this template now\n\t\t\t\t\t<\/a>\n\t<img decoding=\"async\" src=\"https:\/\/sitemate.com\/wp-content\/uploads\/2019\/03\/Project-handover-checklist-template.jpg\" alt=\"Daily diary template\" loading=\"lazy\" \/>\n\t<p>Construction Project Handover Checklist templat<\/p>\n\t<p>This project handover checklist template ensures you have taken all of the neccesary handover steps, and documented all of those steps too.<\/p>\n\t\t\t<a href=\"https:\/\/sitemate.com\/nz\/templates\/commercial\/forms\/construction-project-handover-checklist\/\" target=\"_self\">\n\t\t\t\t\t\t\tSee the template\n\t\t\t\t\t<\/a>\n\t<img decoding=\"async\" src=\"https:\/\/sitemate.com\/wp-content\/uploads\/2018\/07\/Punchlist.jpg\" alt=\"Meeting Minutes template\" loading=\"lazy\" \/>\n\t<p>Construction Punch List template<\/p>\n\t<p>Punch your way through those punch lists with this powerful template.<\/p>\n\t\t\t<a href=\"https:\/\/sitemate.com\/nz\/templates\/quality\/forms\/construction-punch-list-template\/\" target=\"_self\">\n\t\t\t\t\t\t\tSee the template\n\t\t\t\t\t<\/a>\n\t<img decoding=\"async\" src=\"https:\/\/sitemate.com\/wp-content\/uploads\/2018\/07\/Daily-progress.jpg\" alt=\"Progress Claim template\" loading=\"lazy\" \/>\n\t<p>Daily Progress Report for Construction template<\/p>\n\t<p>Improve your project management by providing clear, detailed records and facilitating communication among team members<\/p>\n\t\t\t<a href=\"https:\/\/sitemate.com\/nz\/templates\/production\/forms\/daily-progress-report-construction-template\/\" target=\"_self\">\n\t\t\t\t\t\t\tSee the template\n\t\t\t\t\t<\/a>\n\t<h2>Sitemate builds best in class tools for built world companies.<\/h2>\n\t\t\t<a href=\"https:\/\/sitemate.com\/nz\/\" target=\"_self\">\n\t\t\t\t\t\t\tLearn more\n\t\t\t\t\t<\/a>\n\t\t\t<a href=\"https:\/\/sitemate.com\/nz\/software\/dashpivot\/demo\/\" target=\"_self\">\n\t\t\t\t\t\t\tWatch demo videos\n\t\t\t\t\t<\/a>\n\t<img decoding=\"async\" src=\"https:\/\/sitemate.com\/wp-content\/uploads\/2020\/11\/20-11-11-User-pair-37-1-1.svg\" loading=\"lazy\" \/>\n\t<h3>Use and edit template for free<\/h3>\n\t\t\t<a href=\"https:\/\/dashpivot.com\/signup?reference=construction-project-handover-procedure-article&#038;templateId=5c86eb776a7f7c2ddcfadbe4\" target=\"_self\" rel=\"nofollow noopener\">\n\t\t\t\t\t\t\tUse this template now\n\t\t\t\t\t<\/a>","protected":false},"excerpt":{"rendered":"<p>Construction project handover procedure In this article, we cover the construction project handover procedure, how to get it right, and provide resources to better manage your site handovers on-site. What does a construction project handover procedure involve? All phases of a construction project are vital to the success of the project, including the project handover&hellip;<\/p>","protected":false},"author":2,"featured_media":10203,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","rank_math_title":"Construction project handover procedure: The right procedure for you","rank_math_description":"Getting your construction project handover procedure right can solve a lot of headaches for you. Here's the right project handover procedure to follow.","rank_math_canonical_url":"","rank_math_focus_keyword":"construction project handover procedure"},"categories":[14,11],"tags":[],"industry":[],"product":[],"region":[],"system":[],"content_type":[],"class_list":["post-10200","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction","category-commercial"],"acf":[],"custom_permalink":"resources\/articles\/construction\/construction-project-handover-procedure","_links":{"self":[{"href":"https:\/\/sitemate.com\/nz\/wp-json\/wp\/v2\/posts\/10200","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sitemate.com\/nz\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sitemate.com\/nz\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sitemate.com\/nz\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/sitemate.com\/nz\/wp-json\/wp\/v2\/comments?post=10200"}],"version-history":[{"count":0,"href":"https:\/\/sitemate.com\/nz\/wp-json\/wp\/v2\/posts\/10200\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sitemate.com\/nz\/wp-json\/wp\/v2\/media\/10203"}],"wp:attachment":[{"href":"https:\/\/sitemate.com\/nz\/wp-json\/wp\/v2\/media?parent=10200"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sitemate.com\/nz\/wp-json\/wp\/v2\/categories?post=10200"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sitemate.com\/nz\/wp-json\/wp\/v2\/tags?post=10200"},{"taxonomy":"industry","embeddable":true,"href":"https:\/\/sitemate.com\/nz\/wp-json\/wp\/v2\/industry?post=10200"},{"taxonomy":"product","embeddable":true,"href":"https:\/\/sitemate.com\/nz\/wp-json\/wp\/v2\/product?post=10200"},{"taxonomy":"region","embeddable":true,"href":"https:\/\/sitemate.com\/nz\/wp-json\/wp\/v2\/region?post=10200"},{"taxonomy":"system","embeddable":true,"href":"https:\/\/sitemate.com\/nz\/wp-json\/wp\/v2\/system?post=10200"},{"taxonomy":"content_type","embeddable":true,"href":"https:\/\/sitemate.com\/nz\/wp-json\/wp\/v2\/content_type?post=10200"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}