{"id":55421,"date":"2026-09-01T02:59:51","date_gmt":"2026-09-01T02:59:51","guid":{"rendered":"https:\/\/sitemate.com\/asphalting-safe-work-method-statement-swms\/"},"modified":"2026-09-16T17:18:51","modified_gmt":"2026-09-16T17:18:51","slug":"asphalting-safe-work-method-statement-swms","status":"publish","type":"post","link":"https:\/\/sitemate.com\/uk\/templates\/safety\/forms\/safe-work-method-statement-asphalt\/","title":{"rendered":"Asphalting Safe Work Method Statement (SWMS)"},"content":{"rendered":"","protected":false},"excerpt":{"rendered":"","protected":false},"author":10,"featured_media":56663,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","rank_math_title":"Asphalting Safe Work Method Statement (SWMS) | Sitemate","rank_math_description":"Free Asphalting Safe Work Method Statement (SWMS) template for road surfacing, paving & compaction work. Covers hazards, controls & sign-off. Try it free.","rank_math_canonical_url":"","rank_math_focus_keyword":"Asphalting Safe Work Method Statement (SWMS)"},"categories":[147],"tags":[],"industry":[127,123],"product":[78],"region":[80],"system":[87],"content_type":[99],"topic":[],"class_list":["post-55421","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-migration","industry-airport-construction","industry-civil-construction","product-dashpivot","region-aus","system-safety","content_type-template-landing-page"],"acf":{"template_lp_template_name":"Asphalting Safe Work Method Statement (SWMS)","template_lp_gallery_repeater":null,"template_lp_template_introduction":"<p>This Asphalting Safe Work Method Statement, or Asphalting SWMS, is an easy-to-use form that your workers can use to plan and manage asphalting risks before road surfacing, patching, or pavement repair work begins. Easily select the scope of work, possible hazards, and required PPE from a list of choices, then work through a ready-to-use list of job steps, risk assessments, and method statements for common asphalting activities.<br>\nLooking for a smart asphalting SWMS you can download and edit? It comes pre-filled with asphalting job steps, risk assessments, and method statements you can edit to match how your company works, and your crew can scan to sign on before starting and export the finished SWMS to PDF or CSV.<\/p>","template_lp_template_name_abbreviation":"SWMS","template_lp_function":"Safety","template_lp_function_url":"","template_lp_template_image_cover":"https:\/\/sitemate.com\/wp-content\/uploads\/2026\/09\/Asphalting-Safe-Work-Method-Statement-SWMS1-13-scaled.jpg","template_image_gallery_repeater_url":[56665,56666,56667,56668,56669,56670,56671,56672,56673,56674,56675,56676,56663],"template_lp_what_is_description":"<p>An Asphalting Safe Work Method Statement, or Asphalting SWMS, is a document used by site teams, supervisors, plant operators, and road crews to plan how asphalt work will be carried out safely. This SWMS usually includes details on the work area, traffic controls, asphalt materials, delivery trucks, paving equipment, rollers, hot work surfaces, PPE, job steps, hazards, risk ratings, and control measures.<br>\nDue to the risks that come with asphalting work, hazards such as hot asphalt burns, fumes, moving plant, live traffic, manual handling, slips, noise, and poor visibility have to be planned around to lessen potential accidents. This makes Asphalting SWMS documents highly relevant in Australian roadworks, civil construction, infrastructure, utilities, council works, and maintenance projects where asphalt is laid, repaired, compacted, or resurfaced.<\/p>","template_lp_template_variation_name":"Asphalt Work Method Statement","template_lp_document_comparison_header":"Compare this Asphalt Work Method Statement Form to traditional Word and PDF documents","template_lp_document_comparison_content":"<p>Curious to see how this Asphalting Safe Work Method Statement\u00a0works? Check out the free preview below and see how it could streamline your SWMS process.<\/p>","template_url_dashpivot_url":"https:\/\/dashpivot.com\/embed\/library-apps\/5d76d9fa7c3ad31fa6d4e689","template_lp_applicable_standards_content":"<p>There are generally no explicit formatting requirements for an Asphalting Safe Work Method Statement. However, Australian WHS laws require PCBUs to prepare a SWMS for high-risk construction work and to document the hazards, risks, and control measures involved in asphalting, roadworks, mobile plant, and hot material handling. An Asphalting SWMS is a good document to support compliance with this.<\/p>\n<ul>\n<li>Model WHS Regulations require a SWMS for high-risk construction work in Australia<\/li>\n<li>Safe Work Australia\u2019s Construction Work Code of Practice covers SWMS requirements for high-risk construction work<\/li>\n<li>Safe Work Australia guidance covers mobile plant, traffic management, and roadworks risks<\/li>\n<li>Safe Work Australia guidance covers hazardous manual tasks and exposure to fumes or hot materials<\/li>\n<li>State and territory WHS laws commonly require SWMS documents before high-risk construction work begins<\/li>\n<\/ul>","template_lp_staff_members_and_parties_content":"<p>An Asphalting SWMS is primarily used by project teams that manage asphalt laying, road surfacing, paving, compaction, traffic control, mobile plant, and hot works near live traffic or other workers. Here are examples of other common parties that use an Asphalting SWMS:<\/p>\n<ul>\n<li>Site supervisors and project managers<\/li>\n<li>Asphalt workers and paving crews<\/li>\n<li>Roller operators and plant operators<\/li>\n<li>Traffic controllers and spotters<\/li>\n<li>Contractors and subcontractors carrying out asphalting work<\/li>\n<\/ul>","template_lp_business_risks_content":"<p>An Asphalting SWMS puts controls in place for the hazards behind most asphalting incidents, such as burns from hot asphalt, fumes, plant interaction, struck-by and reversing incidents, traffic exposure, manual handling, and poor ground conditions. Applied consistently, it reduces the following business risks.<\/p>\n<ul>\n<li>Injuries, burns, and asphalting-related incidents<\/li>\n<li>Non-compliance with Australian SWMS and roadwork safety requirements<\/li>\n<li>Legal claims, enforcement action, and incident-related costs<\/li>\n<li>Project delays from plant incidents, traffic disruptions, investigations, and site shutdowns<\/li>\n<\/ul>","template_lp_business_opportunities":"<p>A well-prepared Asphalting SWMS helps businesses improve control over road surfacing, hot material handling, mobile plant movement, and traffic-related risks. Here are some ways a well-designed Asphalting SWMS can help businesses:<\/p>\n<ul>\n<li>Improve worker confidence before asphalting work begins<\/li>\n<li>Strengthen contractor prequalification and tender-offer competitiveness<\/li>\n<li>Improve coordination between supervisors, asphalt crews, plant operators, and traffic controllers<\/li>\n<li>Build trust with clients, regulators, insurers, and project stakeholders<\/li>\n<\/ul>","template_lp_checklist_heading":"What Should be Included in an Asphalting SWMS?","template_lp_checklist_content":"<p>An Asphalting SWMS should be prepared before asphalting activities are carried out as part of high risk construction work. While exact requirements can vary across Australian states, territories, projects, and principal contractor requirements, there are some core elements that are typically included that you should know about:<\/p>\n<ul>\n<li>Scope of work, work area, asphalt type, plant, equipment, and responsible persons<\/li>\n<li>Job steps for setting up, traffic control, asphalt delivery, paving, rolling, compaction, clean-up, and pack-up<\/li>\n<li>Hazards such as burns, fumes, moving plant, live traffic, noise, vibration, manual handling, and public interfaces<\/li>\n<li>Required controls such as exclusion zones, traffic management, PPE, spotters, communication methods, ventilation, and emergency wash facilities<\/li>\n<li>Risk ratings, emergency procedures, worker consultation, sign-off, and review requirements<\/li>\n<\/ul>","template_lp_extra_heading":"Why are Asphalting SWMS Important?","template_lp_extra_heading_content":"<p>Asphalting SWMS are important because asphalting work can expose workers to hot materials, fumes, moving plant, live traffic, noise, and manual handling risks. This is critically important on roadwork, civil, driveway, car park, and infrastructure projects where asphalt crews may work close to pavers, rollers, trucks, pedestrians, and public traffic.<br>\nEssentially, an Asphalting SWMS helps confirm that the work steps, traffic controls, plant movements, hot work risks, and emergency procedures have been reviewed before the task begins. Additionally, it gives project management teams clear documentation of the due diligence performed, supporting consultation, site coordination, and compliance with Australian WHS requirements for high risk construction work.<\/p>","template_lp_sbs_group":{"template_lp_step_by_step_title":"How to Create an Asphalting Safe Work Method Statement (SWMS)","template_lp_step_by_step_introduction":"<p>Building effective Asphalting SWMS forms requires the right structure and information. In this section, we explain how to create your own SWMS forms from scratch.<\/p>","template_lp_step_by_step_subtitle":"Before starting your Asphalting Safe Work Method Statement (SWMS) form, the following pre-requisites should be ready.","template_lp_step_by_step_content":"<ul>\n<li>Project or site details are required.<\/li>\n<li>Asphalting scope and work area must be listed.<\/li>\n<li>High-risk construction work details must be covered.<\/li>\n<li>Hazards, risks, and control measures must be stated.<\/li>\n<li>Plant, equipment, and hot material controls must be included.<\/li>\n<li>Traffic, pedestrian, and PPE requirements must be noted.<\/li>\n<li>Worker sign-off and SWMS review requirements must be recorded.<\/li>\n<\/ul>"},"template_lp_sbs_step_1_group":{"template_lp_sbs_step_1_header":"Start with Project and SWMS Information","template_lp_sbs_step_1_content":"<p>First, you need to place high-level general information at the beginning of your Asphalting Safe Work Method Statement to help establish context for the work to be done. Here are some examples of core elements that you can use:<\/p>\n<ul>\n<li>Project name and site location<\/li>\n<li>SWMS title and document reference number<\/li>\n<li>Description of asphalting works to be completed<\/li>\n<li>Name of the PCBU, contractor, or subcontractor<\/li>\n<li>Names and roles of workers, supervisors, and plant operators<\/li>\n<\/ul>"},"template_lp_sbs_repeater":[{"template_lp_sbs_repeater_title":"Define the Scope and Work Method","template_lp_sbs_repeater_content":"<p>Next, you will want to define the scope of work so it is clear what asphalting activities are covered by the SWMS. For example, you will want to list the following information in your Asphalting SWMS:<\/p>\n<ul>\n<li>Type of asphalting work being completed<\/li>\n<li>Work area, road section, or pavement location<\/li>\n<li>Asphalt delivery, paving, rolling, and compaction steps<\/li>\n<li>Plant, tools, and equipment required for the task<\/li>\n<li>Traffic control, access, and exclusion zone requirements<\/li>\n<\/ul>"},{"template_lp_sbs_repeater_title":"Assess Asphalting Hazards","template_lp_sbs_repeater_content":"<p>It is important that potential hazards are identified before asphalting work starts so the appropriate safety control measures can be implemented. Common hazards that you should look out for include:<\/p>\n<ul>\n<li>Contact with hot asphalt, bitumen, or heated surfaces<\/li>\n<li>Mobile plant movement from pavers, rollers, trucks, and other vehicles<\/li>\n<li>Working near live traffic or pedestrian areas<\/li>\n<li>Fumes, vapours, dust, noise, or vibration<\/li>\n<li>Slips, trips, uneven ground, or poor visibility<\/li>\n<\/ul>"},{"template_lp_sbs_repeater_title":"Record Safety Control Measures and Monitoring Requirements","template_lp_sbs_repeater_content":"<p>After the hazards are identified, you will want to determine the appropriate safety control measures to reduce risks for your workers and nearby site personnel. Be sure to document the following information in your SWMS:<\/p>\n<ul>\n<li>Traffic control plans, signage, barriers, and spotters, where required<\/li>\n<li>PPE requirements such as heat-resistant gloves, eye protection, long sleeves, and safety footwear<\/li>\n<li>Plant pre-start checks and operator competency requirements<\/li>\n<li>Safe delivery, tipping, paving, and rolling arrangements<\/li>\n<li>Stop work triggers for unsafe traffic conditions, poor visibility, plant issues, or changing site conditions<\/li>\n<\/ul>"}],"template_lp_sbs_final_group":{"template_lp_sbs_final_header":"Complete Review, Approval, and Worker Sign-Off","template_lp_sbs_final_content":"<p>Complete your Asphalting SWMS with review, approval, and worker sign-off to confirm that the work method and safety control measures have been communicated before work starts. Here are some examples of fields you can include:<\/p>\n<ul>\n<li>Names and roles of reviewers and approvers<\/li>\n<li>Date of review and approval<\/li>\n<li>Worker acknowledgement that the SWMS has been read and understood<\/li>\n<li>Supervisor or person in charge sign-off<\/li>\n<li>Revision number and next review trigger<\/li>\n<\/ul>"},"template_lp_faq_1":"What is an Asphalting SWMS used for?","template_lp_faq_1_answer":"<p>An Asphalting SWMS is used to plan how asphalt work will be done safely before it starts. This is important where workers may be exposed to hot bitumen, burns, fumes, moving plant, live traffic, reversing vehicles, manual handling, noise, and changing ground or weather conditions.<\/p>","template_lp_faq_2":"Are there any regulations or legislation on how to format an Asphalting SWMS?","template_lp_faq_2_answer":"<p>There is no single required layout for an Asphalting SWMS in Australia. However, WHS regulations require a SWMS for high risk construction work, and asphalting may trigger this where there is work near traffic, powered mobile plant, hot materials, or other high risk construction conditions. The SWMS should set out the work, hazards, controls, and how those controls will be checked.<\/p>","template_lp_faq_3":"What should be included in an Asphalting SWMS?","template_lp_faq_3_answer":"<p>An Asphalting SWMS should include the work area, job steps, asphalt plant and equipment, hazards, control measures, PPE, traffic controls, exclusion zones, fume controls, hot material handling, emergency steps, and worker sign-off. It should also cover site-specific risks such as night works, public access, weather, and nearby services.<\/p>","template_lp_faq_4":"How is AI helping teams create Asphalting SWMS documents?","template_lp_faq_4_answer":"<p>AI can help teams create Asphalting SWMS documents by turning site notes, job steps, plant details, traffic plans, and known hazards into a clear draft. It can also help flag missing controls, suggest practical asphalting checks, and clean up rough inputs such as safe work method statement into usable SWMS content.<\/p>","template_lp_process_name":"SWMS process","template_lp_process_steps_content":"<p>A well-designed SWMS process ensures workers clearly understand the hazards, risks, and required control measures to perform high-risk work, while enabling your team to easily document, review, and share safe work procedures before work begins.<\/p>","estimated_time":"40 minutes","template_lp_difficulty":"medium","template_lp_lower_sbs_step_1_group":{"template_lp_sbs_lower_step_1_header":"Start your Asphalting SWMS with General Information","template_lp_sbs_lower_step_1_content":"<p>It is important to begin your Asphalting Safe Work Method Statement (SWMS) with key project, site, date, reference, and location details so the document can be traced to the correct asphalt works. This section should use simple text and date fields for fields such as:<\/p>\n<ul>\n<li>Text field or Automatic Form Counter for SWMS Reference Number<\/li>\n<li>Date selector field for Date<\/li>\n<li>Text fields for Project Name and Address<\/li>\n<li>Text field for Single Day Weather<\/li>\n<li>Multi-line text field for Description of Works<\/li>\n<\/ul>"},"template_lp_lower_sbs_repeater":[{"template_lp_lower_sbs_repeater_title":"Create a Section for Scope of Work, Hazards, and PPE","template_lp_lower_sbs_repeater_content":"<p>Next, create a section where users can select the project scope, possible hazards, and required PPE for the asphalting works. For simplicity, we recommend using multiple-choice selector fields for this section, with fields such as:<\/p>\n<ul>\n<li>Multiple-choice selector field for Project Scope, including Civil & Structural and Environmental<\/li>\n<li>Multiple-choice selector field for Possible Hazards, including Communications, Dust, Fire & Explosion, Hazardous Substances, Heat, Manual Handling, Moving Plant \/ Machinery, Noise \/ Vibration, Site Housekeeping, Slips \/ Trips \/ Falls, Traffic, and Weather Conditions<\/li>\n<li>Multiple-choice selector field for PPE Required, including Ear Protection, Eye Protection, Hand Protection, Hard Hat, Illuminating Safety Vest, Overalls, Safety Footwear, Sun Glasses, and Sunscreen<\/li>\n<li>Conditional text field for other hazards or PPE not listed in the pre-filled choices<\/li>\n<\/ul>"},{"template_lp_lower_sbs_repeater_title":"Create a Table for Material and Equipment Information","template_lp_lower_sbs_repeater_content":"<p>Users will next need to list the asphalt pavers, rollers, hot-mix asphalt, and other materials or equipment required for the task. We highly recommend using a table for this section so each item can be recorded with its make, asset details, and required training information.<\/p>\n<ul>\n<li>First column for Material or Equipment Name<\/li>\n<li>Second column for Make or Model<\/li>\n<li>Third column for Registration or Asset ID, if any<\/li>\n<li>Fourth column for Required License or Training, if any<\/li>\n<li>Rows for asphalt pavers, tandem vibratory rollers, hot-mix asphalt, traffic control equipment, and other task-specific items<\/li>\n<\/ul>"},{"template_lp_lower_sbs_repeater_title":"Create a Table for the Method Statement and Risk Assessment","template_lp_lower_sbs_repeater_content":"<p>Next, create the main SWMS table where users can record each asphalting job step, hazards, risk scores, controls, and responsible persons. We highly recommend using a table for this section, with the following formatting for the columns:<\/p>\n<ul>\n<li>First column for Job Step<\/li>\n<li>Second column for Potential Hazards<\/li>\n<li>Third column for Initial Risk Score<\/li>\n<li>Fourth column for Controls<\/li>\n<li>Fifth column for Residual Risk Score<\/li>\n<li>Sixth column for Person Responsible<\/li>\n<\/ul>"},{"template_lp_lower_sbs_repeater_title":"Add Pre-filled Method Statement Rows for Asphalting Work","template_lp_lower_sbs_repeater_content":"<p>After the main table is created, add pre-filled rows that reflect the most common asphalting job steps in the attached SWMS. These rows help users complete the form faster while still allowing the SWMS to be adjusted for the actual site task.<\/p>\n<ul>\n<li>Row for Pre-start planning, work area setup and equipment inspection<\/li>\n<li>Row for Receiving and unloading hot asphalt<\/li>\n<li>Row for Operating asphalt paver and laying asphalt<\/li>\n<li>Row for Hand spreading, raking and finishing asphalt<\/li>\n<li>Row for Compacting asphalt with rollers<\/li>\n<li>Row for Asphalting adjacent to live traffic and mobile plant<\/li>\n<li>Row for Cleaning equipment and completing the work area<\/li>\n<\/ul>"},{"template_lp_lower_sbs_repeater_title":"Create a Section for Additional High-Risk or Site-Specific Steps","template_lp_lower_sbs_repeater_content":"<p>Some asphalting tasks may require extra job steps depending on the work method, site layout, materials used, or traffic control set-up. We highly recommend creating an additional method statement table so users can add extra risk assessment rows when needed.<\/p>\n<ul>\n<li>Additional row for Applying tack coat before asphalt placement<\/li>\n<li>Columns for Job Step, Potential Hazards, Likelihood, Consequence, Initial Risk Score, Controls, Residual Risk Score, and Person Responsible<\/li>\n<li>Text fields for controls covering SDS review, spray exclusion zones, PPE, plant coordination, spill response, and restricted access to freshly sprayed surfaces<\/li>\n<li>Dropdown fields for Likelihood and Consequence scores<\/li>\n<\/ul>"},{"template_lp_lower_sbs_repeater_title":"Create a Section for Risk Matrix Guidance","template_lp_lower_sbs_repeater_content":"<p>Next, add a risk matrix section as a guide for users to assess initial and residual risk scores for any additional job steps they may add. We highly recommend using the following fields and features to help guide users:<\/p>\n<ul>\n<li>Pre-filled or photo of the Risk Matrix table showing Likelihood, Consequence, and Risk Score levels<\/li>\n<li>Pre-filled text field for Consequence ratings from 1 to 5<\/li>\n<li>Pre-filled text field for Likelihood ratings from 1 to 5<\/li>\n<li>Pre-filled guide for residual risk actions, including Low, Moderate, High, and Catastrophic risk outcomes<\/li>\n<\/ul>"}],"template_lp_lower_sbs_final_group":{"template_lp_lower_sbs_final_title":"End your Asphalting SWMS with Acknowledgement and Sign-off","template_lp_lower_sbs_final_content":"<p>Finally, complete the Asphalting Safe Work Method Statement (SWMS) with worker acknowledgement and sign-off fields for the responsible parties. If your app or software allows, use scan-to-sign and automatic e-signature fields to keep the sign-off process digital.<\/p>\n<ul>\n<li>A scan to sign-on table for workers' sign-off<\/li>\n<li>E-signature field for Supervisor Sign-off<\/li>\n<li>E-signature field for Project Manager Sign-off<\/li>\n<li>Automatic date and time stamp fields for each sign-off<\/li>\n<\/ul>"},"template_lp_author_select":[{"template_lp_content_author_id_select":"50007"}],"template_lp_published":{"date":"28 August 2026","version":"25-11-v2","author":"Ron","description":"Content rewritten to current editorial and QA standards"},"template_lp_revisions":null,"template_lp_type_of_form":"SWMS form","template_lp_type_of_form_content":"<p>This SWMS form was generated using Dashpivot, where your team can create safety forms and method statements with smart checklists, photo attachments, weather capture, and even scan-to-sign-on, all with just a few clicks.<\/p>","template_lp_script_template_name":"asphalting-safe-work-method-statement-(swms)","template_lp_script_template_id":"5d76d9fa7c3ad31fa6d4e689","template_lp_relevant_app_button":"https:\/\/sitemate.com\/safety\/safe-work-method-statement-app\/","template_lp_relevant_app_photo_1":"https:\/\/sitemate.com\/wp-content\/uploads\/2026\/08\/sitesafetyapp.svg","template_lp_difficulty_selector":"50383","template_lp_breadcrumb":"","template_lp_breadcrumb_schema":""},"custom_permalink":"templates\/safety\/forms\/safe-work-method-statement-asphalt","_links":{"self":[{"href":"https:\/\/sitemate.com\/uk\/wp-json\/wp\/v2\/posts\/55421","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sitemate.com\/uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sitemate.com\/uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sitemate.com\/uk\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/sitemate.com\/uk\/wp-json\/wp\/v2\/comments?post=55421"}],"version-history":[{"count":1,"href":"https:\/\/sitemate.com\/uk\/wp-json\/wp\/v2\/posts\/55421\/revisions"}],"predecessor-version":[{"id":55422,"href":"https:\/\/sitemate.com\/uk\/wp-json\/wp\/v2\/posts\/55421\/revisions\/55422"}],"acf:attachment":[{"embeddable":true,"href":"https:\/\/sitemate.com\/uk\/wp-json\/wp\/v2\/media\/56663"},{"embeddable":true,"href":"https:\/\/sitemate.com\/uk\/wp-json\/wp\/v2\/media\/56676"},{"embeddable":true,"href":"https:\/\/sitemate.com\/uk\/wp-json\/wp\/v2\/media\/56675"},{"embeddable":true,"href":"https:\/\/sitemate.com\/uk\/wp-json\/wp\/v2\/media\/56674"},{"embeddable":true,"href":"https:\/\/sitemate.com\/uk\/wp-json\/wp\/v2\/media\/56673"},{"embeddable":true,"href":"https:\/\/sitemate.com\/uk\/wp-json\/wp\/v2\/media\/56672"},{"embeddable":true,"href":"https:\/\/sitemate.com\/uk\/wp-json\/wp\/v2\/media\/56671"},{"embeddable":true,"href":"https:\/\/sitemate.com\/uk\/wp-json\/wp\/v2\/media\/56670"},{"embeddable":true,"href":"https:\/\/sitemate.com\/uk\/wp-json\/wp\/v2\/media\/56669"},{"embeddable":true,"href":"https:\/\/sitemate.com\/uk\/wp-json\/wp\/v2\/media\/56668"},{"embeddable":true,"href":"https:\/\/sitemate.com\/uk\/wp-json\/wp\/v2\/media\/56667"},{"embeddable":true,"href":"https:\/\/sitemate.com\/uk\/wp-json\/wp\/v2\/media\/56666"},{"embeddable":true,"href":"https:\/\/sitemate.com\/uk\/wp-json\/wp\/v2\/media\/56665"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sitemate.com\/uk\/wp-json\/wp\/v2\/media\/56663"}],"wp:attachment":[{"href":"https:\/\/sitemate.com\/uk\/wp-json\/wp\/v2\/media?parent=55421"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sitemate.com\/uk\/wp-json\/wp\/v2\/categories?post=55421"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sitemate.com\/uk\/wp-json\/wp\/v2\/tags?post=55421"},{"taxonomy":"industry","embeddable":true,"href":"https:\/\/sitemate.com\/uk\/wp-json\/wp\/v2\/industry?post=55421"},{"taxonomy":"product","embeddable":true,"href":"https:\/\/sitemate.com\/uk\/wp-json\/wp\/v2\/product?post=55421"},{"taxonomy":"region","embeddable":true,"href":"https:\/\/sitemate.com\/uk\/wp-json\/wp\/v2\/region?post=55421"},{"taxonomy":"system","embeddable":true,"href":"https:\/\/sitemate.com\/uk\/wp-json\/wp\/v2\/system?post=55421"},{"taxonomy":"content_type","embeddable":true,"href":"https:\/\/sitemate.com\/uk\/wp-json\/wp\/v2\/content_type?post=55421"},{"taxonomy":"topic","embeddable":true,"href":"https:\/\/sitemate.com\/uk\/wp-json\/wp\/v2\/topic?post=55421"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}