Use and edit template for free

Elevated Work Platform (EWP) Safe Work Method Statement Template

Start with a free 30-day trial. No credit card required.

This Elevated Work Platform Safe Work Method Statement, or EWP SWMS, is an easy-to-use form that your workers can use to plan and manage elevated work platform risks before working at height. Easily select the scope of work, possible hazards, and required PPE from a list of choices, then work through a ready-to-use list of job steps, risk assessments, and method statements for common EWP activities.
Need a complete EWP SWMS you can still make your own? This one arrives with pre-start inspections, ground condition checks, exclusion zones, emergency lowering, harness requirements, overhead hazard checks, platform access, and shutdown already written in. Edit any of it to match how your company works, and the document still holds up against the regulations you'd be audited on.

   100% fully editable Elevated Work Platform (EWP) Safe Work Method Statement

   Export your Elevated Work Platform (EWP) Safe Work Method Statement to PDF or CSV

   Access EWP SWMS Form on mobile, tablet or computer

Elevated Work Platform (EWP) Safe Work Method Statement Template

What is Elevated Work Platform (EWP) Safe Work Method Statement?

An Elevated Work Platform Safe Work Method Statement, or EWP SWMS, is a document used by site teams, supervisors, and EWP operators to plan how elevated work platform activities will be carried out safely. This SWMS usually includes details on the EWP type, work area, ground conditions, access height, overhead hazards, fall protection, emergency lowering, PPE, job steps, hazards, risk ratings, and control measures.
Due to the risks that come with working at height from mobile plant, hazards such as falls, tip-overs, crush injuries, overhead services, falling objects, unstable ground, and poor access have to be planned around to lessen potential accidents. This makes EWP SWMS documents highly relevant in Australian construction, maintenance, utilities, warehousing, facilities management, infrastructure, and industrial projects where elevated work platforms are used for access or work at height.

See how this EWP SWMS Form compares with traditional Word, Excel, and PDF-based processes

See how this EWP Safe Work Method Statement can help make creating, completing, and managing SWMS more efficient. Preview it for free below.

Use this Elevated Work Platform (EWP) Safe Work Method Statement template for free

Generate this template automatically with Storm

You don't have to build the SWMS process field by field. Let Storm, the AI Data Capture Agent inside Dashpivot, build the template for you in seconds.

Describe what you need

Tell Storm the form you want in plain language and it builds a structured digital template from scratch, with fields, tables, and signatures in place.

Upload what you already use

Drop in your existing PDF, Word, Excel, or even a photo of a paper form. Storm rebuilds it as a smart digital template with the structure intact.

Storm
AI Templates
Write instructions or upload a file to build a template.

Generate a SWMS process form template that I can use for my business

Generate Import
Preferences
Build

Applicable Standards and Policies for Elevated Work Platform (EWP) Safe Work Method Statement

There are generally no explicit formatting requirements for an Elevated Work Platform Safe Work Method Statement. However, Australian WHS laws require PCBUs to prepare a SWMS for high-risk construction work and to document the hazards, risks, and control measures involved in EWP use and work at height. An EWP SWMS is a good document to support compliance with this.

  • Model WHS Regulations require a SWMS for high-risk construction work in Australia
  • Safe Work Australia’s Construction Work Code of Practice covers SWMS requirements for high-risk construction work
  • Safe Work Australia’s Managing the Risk of Falls at Workplaces Code of Practice 2018 covers work at height risks
  • Safe Work Australia guidance covers mobile plant, EWPs, and falling object risks
  • State and territory WHS laws commonly require SWMS documents before high-risk construction work begins

Staff Members and Parties that use Elevated Work Platform (EWP) Safe Work Method Statement

An EWP SWMS is primarily used by project teams that manage boom lifts, scissor lifts, vertical lifts, mobile plant, elevated access, or other work at height activities. Here are examples of other common parties that use an EWP SWMS:

  • Site supervisors and project managers
  • EWP operators
  • Spotters and ground workers
  • Health and safety teams
  • Contractors and subcontractors working at height

Business Risks Reduced by Elevated Work Platform (EWP) Safe Work Method Statement

An EWP SWMS puts controls in place for the hazards that cause the most harm around elevated work platforms — tip-overs, crush injuries between the platform and overhead structures, falling objects, unstable ground, and interaction with people or plant below. Applied consistently, it reduces the following business risks:

  • Injuries, fatalities, and EWP-related incidents
  • Non-compliance with Australian SWMS and work at height requirements
  • Legal claims, enforcement action, and incident-related costs
  • Project delays from incidents, damaged assets, investigations, and shutdowns

Business Opportunities Created by Elevated Work Platform (EWP) Safe Work Method Statement

A well-prepared EWP SWMS helps businesses improve control over elevated access, mobile plant movement, and work at height activities. Here are some ways a well-designed EWP SWMS can help businesses:

  • Improve worker confidence before using elevated work platforms
  • Strengthen contractor prequalification and tender-offer competitiveness
  • Improve coordination between supervisors, EWP operators, spotters, and site teams
  • Build trust with clients, regulators, insurers, and project stakeholders

What Should be Included in an EWP SWMS?

An EWP SWMS should be prepared before elevated work platform activities are carried out as part of high risk construction work. While exact requirements can vary across Australian states, territories, projects, and principal contractor requirements, there are some core elements that are typically included that you should know about:

  • Scope of work, work area, EWP type, operating height, and responsible persons
  • Job steps for pre-start checks, setup, access, operation, repositioning, emergency lowering, and pack-up
  • Hazards such as falls, crushing, overturning, unstable ground, overhead services, dropped objects, and mobile plant interaction
  • Required controls such as exclusion zones, harnesses, anchor points, ground checks, spotters, emergency lowering procedures, and operator competency
  • Risk ratings, PPE, emergency procedures, worker consultation, sign-off, and review requirements

Why are EWP SWMS Important?

EWP SWMS are important because elevated work platforms can expose workers to serious risks when operating at height, near structures, overhead services, uneven ground, or other plant. This is critically important on construction, maintenance, fit-out, civil, and industrial sites where EWPs may be used for access, installation, inspection, and repair work.
Essentially, an EWP SWMS helps confirm that the work steps, height risks, ground conditions, emergency lowering procedures, and safety controls have been reviewed before the task begins. Additionally, it gives project management teams clear documentation of the due diligence performed, supporting consultation, site coordination, and compliance with Australian WHS requirements for high risk construction work.

How to Create an Elevated Work Platform (EWP) Safe Work Method Statement

Building effective EWP SWMS forms requires the right structure and information. In this section, we explain how to create your own SWMS forms from scratch.

Before starting your Elevated Work Platform (EWP) Safe Work Method Statement form, the following pre-requisites should be ready.

  • Project or site details are required.
  • EWP type and work area must be listed.
  • High-risk construction work details must be covered.
  • Hazards, risks, and control measures must be stated.
  • Operator competency and equipment checks must be included.
  • Ground, overhead, and fall controls must be noted.
  • Worker sign-off and SWMS review requirements must be recorded.

Start with Project and SWMS Information

First, you need to place high-level general information at the beginning of your Elevated Work Platform Safe Work Method Statement to help establish context for the work to be done. Here are some examples of core elements that you can use:

  • Project name and site location
  • SWMS title and document reference number
  • Description of EWP work to be completed
  • Name of the PCBU, contractor, or subcontractor
  • Names and roles of workers, supervisors, and EWP operators

Define the Scope of EWP Works

Next, you will want to define the scope of work so it is clear what EWP activities are covered by the SWMS. For example, you will want to list the following information in your EWP SWMS:

  • Type of EWP being used, such as boom lift or scissor lift
  • Work area, height, and access requirements
  • Task to be completed from the platform
  • Ground conditions, travel path, and set-up location
  • Tools, materials, and equipment required for the task

Assess EWP Hazards

It is important that potential hazards are identified before EWP work starts so the appropriate safety control measures can be implemented. Common hazards that you should look out for include:

  • Falls from the platform or unsafe access
  • EWP overturning due to unstable ground, slopes, or poor set-up
  • Crush risks against structures, beams, or overhead obstructions
  • Contact with power lines, services, plant, or nearby equipment
  • Falling tools, materials, or objects from the platform

Record Safety Control Measures

After the hazards are identified, you will want to determine the appropriate safety control measures to reduce risks for your workers and nearby site personnel. Be sure to document the following information in your SWMS:

  • Operator competency and high-risk work licence requirements, where applicable
  • Pre-start checks for the EWP, platform, controls, tyres, and emergency lowering system
  • Harness, lanyard, and anchor point requirements, where required
  • Exclusion zones, barricades, and traffic controls around the EWP
  • Safe approach distances from power lines and other overhead hazards

Set Out the Work Method and Monitoring Requirements

Next, you will want to outline the work method so workers understand the safe sequence for completing EWP activities. This section should also explain how the work will be checked while it is underway.

  • Work area inspection before EWP set-up
  • EWP positioning, platform access, work execution, lowering, and pack-up steps
  • Communication method between operators, spotters, and ground workers
  • Inspection points for ground conditions, overhead hazards, and weather changes
  • Stop work triggers for high winds, unstable ground, faulty controls, or unsafe access

Complete Review, Approval, and Worker Sign-Off

Complete your EWP SWMS with review, approval, and worker sign-off to confirm that the work method and safety control measures have been communicated before work starts. Here are some examples of fields you can include:

  • Names and roles of reviewers and approvers
  • Date of review and approval
  • Worker acknowledgement that the SWMS has been read and understood
  • Supervisor or person in charge sign-off
  • Revision number and next review trigger

Frequently asked questions

What is an EWP SWMS used for?

Are there any regulations or legislation on how to format an EWP SWMS?

What should be included in an EWP SWMS?

How is AI helping teams create EWP SWMS documents?

How to create SWMS process in an App or Software System

A well-designed SWMS process ensures workers clearly understand the hazards, risks, and required control measures to perform high-risk work, while enabling your team to easily document, review, and share safe work procedures before work begins.

40 minutes

Medium difficulty

Start your EWP SWMS with General Information

It is important to begin your EWP Safe Work Method Statement (SWMS) with key project, site, date, reference, and location details so the document can be traced to the correct elevated work platform activity. This section should use simple text and date fields for fields such as:

  • Text field or Automatic Form Counter for SWMS Reference Number
  • Date selector field for Date
  • Text fields for Project Name and Address
  • Text field for Single Day Weather
  • Multi-line text field for Description of Works

Create a Section for Scope of Work, Hazards, and PPE

Next, create a section where users can select the project scope, possible hazards, and required PPE for the EWP works. For simplicity, we recommend using multiple-choice selector fields for this section, with fields such as:

  • Multiple-choice selector field for Project Scope, including Civil & Structural, Electrical, and Mechanical
  • Multiple-choice selector field for Possible Hazards, including Communications, Electricity, Falling Objects, Heights, Moving Plant / Machinery, Site Housekeeping, Slips / Trips / Falls, Traffic, Underground / Overhead Services, and Weather Conditions
  • Multiple-choice selector field for PPE Required, including Eye Protection, Hand Protection, Hard Hat, Illuminating Safety Vest, Safety Footwear, and Safety Harness
  • Conditional text field for other hazards or PPE not listed in the pre-filled choices

Create a Table for Material and Equipment Information

Users will next need to list the EWP, harnesses, communication equipment, and other equipment required for the task. We highly recommend using a table for this section so each item can be recorded with its make, asset details, and required training information.

  • First column for Material or Equipment Name
  • Second column for Make or Model
  • Third column for Registration or Asset ID, if any
  • Fourth column for Required License or Training, if any
  • Rows for boom-type elevating work platform, full-body harness and energy-absorbing lanyard, two-way UHF radio, and other task-specific equipment

Create a Table for the Method Statement and Risk Assessment

Next, create the main SWMS table where users can record each EWP job step, hazards, risk scores, controls, and responsible persons. We highly recommend using a table for this section, with the following formatting for the columns:

  • First column for Job Step
  • Second column for Potential Hazards
  • Third column for Initial Risk Score
  • Fourth column for Controls
  • Fifth column for Residual Risk Score
  • Sixth column for Person Responsible

Add Pre-filled Method Statement Rows for EWP Work

After the main table is created, add pre-filled rows that reflect the most common EWP job steps in the attached SWMS. These rows help users complete the form faster while still allowing the SWMS to be adjusted for the actual site task.

  • Row for Pre-start planning, work area setup and EWP inspection
  • Row for Accessing and starting the EWP
  • Row for Positioning and travelling the EWP
  • Row for Raising and positioning the work platform
  • Row for Performing work from the elevated platform
  • Row for Operating near structures, workers and other plant
  • Row for Lowering, parking and shutting down the EWP

Create a Section for Additional High-Risk or Site-Specific Steps

Some EWP tasks may require extra job steps depending on transport needs, ramp access, ground conditions, work height, or site layout. We highly recommend creating an additional method statement table so users can add extra risk assessment rows when needed.

  • Additional row for Loading and unloading the EWP from a transport vehicle
  • Columns for Job Step, Potential Hazards, Likelihood, Consequence, Initial Risk Score, Controls, Residual Risk Score, and Person Responsible
  • Text fields for controls covering firm and level ground, secured ramps, exclusion zones, spotter use, low-speed travel, manufacturer loading requirements, boom retraction, and transport restraints
  • Dropdown fields for Likelihood and Consequence scores

Create a Section for Risk Matrix Guidance

Next, add a risk matrix section as a guide for users to assess initial and residual risk scores for any additional job steps they may add. We highly recommend using the following fields and features to help guide users:

  • Pre-filled or photo of the Risk Matrix table showing Likelihood, Consequence, and Risk Score levels
  • Pre-filled text field for Consequence ratings from 1 to 5
  • Pre-filled text field for Likelihood ratings from 1 to 5
  • Pre-filled guide for residual risk actions, including Low, Moderate, High, and Catastrophic risk outcomes

End your EWP SWMS with Worker and Supervisor Sign-offs

Finally, complete the EWP Safe Work Method Statement (SWMS) with worker confirmation and sign-off fields for the responsible parties. If your app or software allows, use scan-to-sign and automatic e-signature fields to keep the sign-off process digital.

  • A scan to sign-on table for workers’ sign-off
  • E-signature field for Supervisor Sign-off
  • E-signature field for Project Manager Sign-off
  • Automatic date and time stamp fields for each sign-off

About the author

Ron Gadugdug

Engineering Content Writer

LinkedIn

Education:

Cebu Institute of Technology - University - Civil Engineering

Bio:

Ron is a Civil Engineer with 6 years of experience in the construction industry, primarily focused on quantity surveying, cost estimation, project management, quality control, contract administration, and property & engineering insurance. At Sitemate, he writes about practical applications of evolving technologies and digital solutions that support construction professionals in improving efficiency, compliance, and project delivery across the built world.

Project Details:

Quantity Surveying & Cost Engineering

Performed quantity take-offs of several high-rise and horizontal structures using sheets and applications like Revit and Bluebeam Revu, and spearheaded trials with Building Information Modeling (BIM) software.

Project Management & Consultancy

Coordinated with project management teams during the construction of local projects such as a 4-tower hotel & resort, a 22 storey condominium project, and a school dormitory project.

Contract Administration

Assisted during contract biddings and negotiations with general contractors and sub-contractors, and oversaw progress reporting, billings, and payment.

Property & Engineering Insurance

Dedicated non-life claims handler, overseeing property and contractor all-risk insurance claims, risk management, and bonds.

Version History:

28/08/2026 25-11-v2 Ron
Content rewritten to current editorial and QA standards

Other popular templates you can use and edit for free

Fatigue Self-Assessment Form

Fatigue Self-Assessment Form

This Fatigue Self-Assessment Form Template is free to use to conduct a fatigue test in the workplace with an easy-to-export feature into PDF.

See the template
Q-Mark Fire Door Installation

Q Mark Fire Door Installation

Make it easy for your fire door installations to be Q-Mark certified with this free digital Q-Mark Fire Door Installation template.

See the template
Hazard reporting app

Hazard Reporting

This hazard reporting app enables you to easily document, manage and action hazard reports to improve safety and compliance. Try the app for free here.

See the template

This SWMS form was generated with Dashpivot software

  • Access, edit and complete your SWMS process from any device - mobile, tablet or computer.
  • Print, download or send your SWMS process as perfectly formatted PDF documents with your company logo.
  • Store your SWMS process securely online, where they can be searched and found in seconds
  • Invite internal and external parties to see, edit and sign off on SWMS process online.

Go digital now, fast and easy