The Safe Work Method Statement App Built for the Front Line
Stop making safe work method statements (SWMS) from scratch. Sitemate’s Safe Work Method Statement App can easily create SWMS templates with just a few simple taps and clicks. Powered by Sitemate’s Dashpivot platform, the SWMS App provides engineers and supervisors with a structured starting point the moment a critical activity is being planned. Every completed SWMS is directly stored, linked to the activity, and establishes a complete audit trail.
Why Safe Work Method Statement management Is Harder than It Should Be
Starting from scratch wastes a lot of time
A paper-based SWMS form would require a substantial amount of time when creating it from scratch, which can delay the needed preparations that are essential to the activity being planned.
Varying and inconsistent forms
Paper-based SWMS templates can vary structurally depending on the site supervisor completing them, which can affect consistency and lengthen review cycles.
Overlooked fields that can increase risks
Supervisors rushing to complete the SWMS form to accommodate tight schedules might miss important sections that help effectively control hazards in the workplace, which increases the risk for injuries and accidents.
Easily lost safe work method statement forms
Paper-based forms are easily lost or get compiled in an area where they are easily forgotten. Such issues can compromise the review process and can lead to lack of evidence during audits.
A Smarter Safe Work Method Statement App
Automatic template creation through AI
Supervisors can easily structure SWMS templates by describing the form to Sitemate’s AI assistant Storm or uploading existing forms to the Dashpivot platform.
Easy SWMS form completion
Sitemate’s AI assistant Storm is integrated into the SWMS App to help build the SWMS forms by using work orders, drawings, hazard registers, and notes.
Fast approvals and signoff
Signatures are captured digitally, removing the need for physical handoffs and ensuring critical activities do not proceed before signoff.
Easily lost safe work method statement forms
All completed SWMS forms are stored in a secure cloud location where users can search or use the filter function to easily compile and review them.
Understanding Safe Work Method Statement Software
What is a Safe Work Method Statement App?
Sitemate's Safe Work Method Statement App is a cutting-edge tool for creating a safety planning document that is required for high-risk construction work under the Work Health and Safety (WHS) Regulation 2017. Powered by the Dashpivot platform, the app employs modern approaches such as digital forms and AI integration to assist workers in understanding the hazards, risks, and safety controls that must be implemented to keep them safe.
How does a safe work method statement app template workflow run?
- Capture work details from scope, drawings, hazards, and supervisor notes
- Draft the method statement with AI-suggested sequencing, controls, and responsibilities
- Review and edit each section so it matches the job and actual site conditions
- Approve and sign off before high-risk work begins, with a recorded approval trail
- Store and link the record to the job for access, reporting, and audits
Why make a safe work method statement?
Safe Work Method Statements are required for all projects. They are meant to implement the essential control measures for the planned activities, as well as orient the personnel on the specific hazards and safety procedures required to perform them. SWMS procedures are essential in preventing accidents, injuries, and fatalities because they provide insights into the nature of the activity, safety procedures, emergency protocols, and specific dangers that workers may face. The purpose is to ensure that every worker, regardless of skill, understands the safety measures required for the intended activity.
-
Storm auto-generates SWMS templates
Storm can extract information from existing SWMS documents, safety procedures, and emergency protocols to create a predefined SWMS form.
-
Data Mapping
Storm populates the form with information on the safety and emergency procedures, specific hazards, and other relevant information that workers need to know before getting deployed in the field.
-
Review and signoff
Relevant stakeholders are immediately notified when a SWMS form is completed, eliminating the need for physical signoffs.
-
Saving completed SWMS
The Dashpivot platform stores all completed SWMS forms in a secure cloud location. Users can easily retrieve completed forms by searching or using the filter function.
See How Sitemate Has Already Helped Companies Like Yours
"Instead of spending 5 days on data entry, it's now just ad hoc time checking the data coming in electronically."
- Rhys Thomas, CFO
95% time saved
On manual HR data entry tasks
0 lost forms
Thanks to digital submission
Link existing protocols to SWMS
Sitemate's Flowsite links safe work procedures, hazard inventories, and control measures to safe work method statements, ensuring all safety requirements are met before deploying workers in the field.
Comparison: Paper Safe Work Method Statement vs Digital Safe Work Method Statement
Most project teams already know paper and spreadsheets aren't cutting it. Here's what changes when you move your method statements to a digital system.
Paper |
||
|---|---|---|
| Versioning | One live version, always current across all teams | Manual copies circulate on-site, quickly outdated |
| Approvals | Digital signoff on-site, timestamped and logged | Wet signatures, chasing people across the site |
| Audit trail | Every edit, review, and approval logged automatically | No record of who reviewed or approved what |
| Offline access | Works offline, syncs when connectivity returns | Paper works on-site but must be retyped later |
| Actions | Actions assigned, tracked, and closed in one place | Follow-ups buried in emails and spreadsheets |
| Reporting | Live dashboards for status, overdue reviews, and coverage | Manual compilation, days to produce a single report |
| Searchability | Instant search across all method statements | Filing cabinets or nested folder hierarchies |
| Permissions | Role-based permissions at every level | Shared drives with no control over who edits what |
| Audit evidence | Auto-compiled from submissions and linked signoff records | Hours collating method statements and approval evidence manually |